Search concepts
|
Selected filters
|
- 1 - 50 out of 620 results
- Export search results
Search results
-
Digital supply chain data flow and risk management theory
Cai, Z. (PI)
1/01/24 → 31/12/28
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Impact of New Independent Director Regulations on Corporate Risk Disclosure and Accounting Information Quality: An Empirical Study Based on Machine Learning Text Analysis
Yuan, S. (PI), Tao, X. (CoI), Chen, J. (CoI), Cai, Z. (CoI), ZHU, K. (CoI) & LIN, C. (CoI)
31/08/24 → 31/12/27
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Multisource Data-based Capacity Control and Collaborative Scheduling of Shared Manufacturing Platform
Tang, L. (PI), Li, C.-L. (PI), Tan, Z. (PI) & Shi, P. (PI)
1/01/24 → 31/12/27
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and development of new intelligent jacks and intelligent lifts
Liu, B. (PI)
1/12/24 → 30/11/27
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and Evaluation of Virtual Co-pilot System for Pilot Training
Sun, X. (PI)
1/04/25 → 30/04/27
Project: Contract Projects › Horizontal-International Contract Projects
-
Intrinsic Mechanism and Optimization Strategy of Audit Quality: Evidence from Zhejiang
Cai, W. (PI), Irawan, C. (CoI), Song, X. (CoI), Jiang, Y. (CoI), Tao, X. (CoI) & Tang, J. (CoI)
1/09/23 → 31/12/26
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on Generative Horizontal Transportation Scheduling Strategies for Container Terminals Driven by Multi-dimensional Knowledge Collaboration
Liu, Q. (PI)
1/01/25 → 31/12/26
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Design Research of Power Tools and Guarding Tools based on University-Industry Collaboration Model
Liu, B. (PI)
1/01/24 → 31/12/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Targeting urban flood resilience with Nature-Based Solutions
Chan, F. (PI)
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The development and application of the sparse search direction in thresholding-type sparse optimization algorithms
Meng, N. (PI)
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Ningbo Key Unmovable Heritage Smart Preservation and Traditional Art Inheritance
Deng, W. (PI), Liu, J. (CoI), Zhou, T. (CoI), Xie, J. (CoI), Ren, J. (CoI), Botti, G. (CoI), Loo, Y. M. (CoI), Zahran, E. S. M. M. (CoI), Zipprich, A. (CoI), Liang, R. (CoI) & Sima, Y. (CoI)
1/08/23 → 31/07/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of Application Technology of Digital Technology in Sports Rehabilitation Scenarios
20/01/25 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
Deng, W. (PI)
1/04/21 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Guidelines for nutritional treatment of adult sepsis patients (Part II)
Xia, J. (PI)
17/04/25 → 16/04/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Key Technologies of Collaborative AGV Scheduling for Complex Digital Twin Systems
Bai, R. (PI), Ren, J. (CoI), Yao, Y. (CoI) & ULLAH, F. (CoI)
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
A systematic review on the application of biological agents in elderly rheumatoid arthritis (RA) patients
Xia, J. (PI)
1/03/25 → 1/03/26
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
BMJ Rapid Recommendation of DMARDS Tapering in People with Rheumatoid Arthritis in Remission
Xia, J. (PI)
1/03/25 → 1/03/26
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Measurement effect testing of diverticulum area in Med-FAUNet model
He, X. (PI)
1/02/24 → 1/02/26
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Bi-objective and Multi-scenario Collaborative Scheduling Methods Considering Carbon Emissions
Tan, Z. (PI)
1/01/23 → 31/12/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Using mobile phone-generated big data to evaluate the impact of tiered-healthcare on health services utilization and epidemic prevention and control
Chen, Z. (PI), Lou, X. (CoI), Li, Y. (CoI) & Chong, A. (CoI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Solid electrolyte interphase characteristics and long cycle stability mechanism of lithium metal batteries
Shen, C. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design for Yangming Culture Creative Lighting
Wu, J. (PI)
31/07/24 → 31/12/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
A Study on Job Task Intensity Measurement, Learning by Doing and Human Capital Formation Mechanism
Liu, Y. (PI)
1/01/23 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
Yang, J. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research Fund for Excellent Young Scientists (RFIS-II), National Natural Science Foundation of China (NSFC)
Ryu, S. (PI)
1/01/24 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Intelligent Multi-point Trigger Early Warning Technology for Infectious Diseases
Xia, J. (PI)
1/09/24 → 31/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Nansongyan Rural Beautification Landscape Design
Mangi, E. (PI) & Palmioli, A. (CoI)
1/08/23 → 30/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
“思政生活化”背景下中外合作高校第二课堂体系建设
Bian, K. (PI)
15/09/23 → 30/09/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
File -
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D. (PI), Mareta, S. (CoI), Ran, L. (CoI), Xu, J. (CoI), Huang, L. (CoI) & Lin, T. (CoI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development and application of robot scheduling system for hospital logistics
1/09/23 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
Shi, Y. (PI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
Xie, J. (PI), Zhou, T. (CoI) & Lu, J. (CoI)
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W. (PI), Xu, M. (CoI), Fow, K. L. (CoI) & Sun, Y. (CoI)
1/09/21 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Deepen Research on the promotion of application of recycled fillers in the "zero waste construction sites"
31/07/24 → 31/07/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Renewable Energy Material Physicochemical Characterisation
Liu, S. (PI)
10/04/24 → 9/04/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Design of Evaluation Index System for Human Resources Service Export Base
Feng, X. (PI), Guan, Y. (CoI), Pan, Y. (CoI) & Liu, L. (CoI)
21/02/25 → 27/02/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
Feng, M. (PI)
1/12/23 → 20/02/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Alzheimer's Disease Care Respite Technology
Sun, X. (PI)
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
File -
An investigation into the influencing mechanism of IT-enabled multi-tier supply chain visibility on supply chain resilience
Pu, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
Wang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI), Li, B. (CoI) & Kow, K. W. (CoI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Guidelines for medication for peripheral neuropathic pain in elderly individuals with organ dysfunction
Xia, J. (PI) & McDonald, S. (CoI)
1/07/24 → 31/12/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Guideline Development of PCV Vaccine Implementation
Hubbard, R. (CoI) & Xia, J. (PI)
18/12/20 → 31/12/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Mechanism on microwave-coupled structured catalysts synergistically enhance the gas-solid catalytic reaction
Shi, K. (PI)
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The stochastic epidemic model driven by α-stable process and its application
Cai, Y. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects