Search concepts
|
Selected filters
|
- 300 - 350 out of 615 results
- Export search results
Search results
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Capacity building for developing standardized and computerized speech and language assessment tools in China
Jin, L. (PI)
1/03/19 → 28/02/21
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
The design and controllable synthesis of coal-fired flue gas Hg0 and SOx transfer catalyst and its mechanism study
Zhao, H. (PI), Xu, M. (CoI) & Yang, G. (CoI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Qualitative Spatial Logics for Validating Matches between Spatial Objects
Du, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Dengfeng City Tourism Industry Strategic Planning Project
Liu, C. (PI)
1/07/20 → 31/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
European Research and Innovation Centre of Excellence in China (ERICENA)
Paramor, O. (PI)
1/01/16 → 31/12/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Research on Design Optimization of Dual-Active-Bridge Power Converters for Energy Recovery Applications
Gu, C. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
The key studies of Satellite-difference RTK PPP applied in huge bridge deformation
Tang, X. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Freight service network design optimisation and its applications
Bai, R. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
Chen, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
On the hybrid machining mechanism and machined surface integrity of free-form aerospace surfaces via textured-grinding-wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Investigation of micro-plastics in the Chinese urban river catchment: the case of Ningbo
Chan, F. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
Hu, D. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on the interaction and deformation of a shallow subway tunnel and an overlapping ground road under long-term traffic loads
Wang, J. (PI)
1/10/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
soil properties under double non-coaxiality and principal stress rotation
Yang, Y. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
The effects of interdiffusion between TBCs and single crystal superalloys on the mechanical characteristics
Chen, H. (PI)
1/09/18 → 31/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Numerical Eulerian-Lagrangian Computations of Coupled Gas-liquid-particle Three-phase Flows
Zhang, X. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Innovation Design Joint Lab
Sun, X. (PI)
1/01/17 → 31/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
Li, B. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Basic research of ironless core two axis compensated compulsators;
Zhao, W. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Indoor Air Pollution Control Technology
He, J. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
Yi, X. (PI)
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Healthcare Management Workshop Liaoning
Hubbard, R. (PI)
6/07/20 → 30/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Mechanism of housing expropriation in Ningbo under the background of urban organic renewal
Liu, C. (PI)
15/11/19 → 30/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Ningbo Primary Care Annual Conference 2020
Chau, P. (PI)
23/09/20 → 30/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on countermeasures to further stimulate the vitality of microeconomic subjects and promote the high-quality development of private and small and medium-sized enterprises in Ningbo
Hua, X. (PI)
1/01/20 → 30/11/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Coating on metal for marine anticorrosion application
Hu, B. (PI)
1/12/17 → 30/11/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Solution for the information system of the building structure and its components
Lu, J. (PI)
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the trend of international technology transfer in the post-epidemic era and countermeasures in Ningbo
Hua, X. (PI)
1/06/20 → 31/10/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
PM2.5Pollution Levels and Influencing Factors of Environmentally Persistent Free Radicals (EPFRs) on PM2.5
Xu, M. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Soil behaviour under bidirectional non-coaxiality and principal stress rotation
Yang, Y. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
5G-V2X adaptive and predictive handover scheme based on reinforced learning5G
Kwong, C. F. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Marine Composites Development and Manufacturing for Sustainable Environment
Liu, X. (PI)
1/10/15 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Precursors synthesis process and stintering process optimization
Li, G. (PI)
1/08/17 → 30/09/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on basic issues of modular electrical machines with low torque ripple based on the carrier phase shift strategy
Zhao, W. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Damage detection of bridge structures subjected to nonlinear effects of changing ambient temperature condition
Chen, Y.-T. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The Green Synthesis of Fit-for-purpose Catalysts for the Pyrolytic Conversion of Municipal Solid Wastes (MSW) using Unwanted Power Station Ash
Pang, C. H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Design and Development of Replenishment Strategy Module for Smart Robotic Warehouse System
Chan, H. K. (PI)
1/09/18 → 31/07/20
Project: Contract Projects › Horizontal-International Contract Projects
-
Design and Development of Order Pick-up and Drop-down Priority Strategy for Cyber-Physical Logistic System
Chan, H. K. (PI)
10/04/19 → 31/07/20
Project: Contract Projects › Horizontal-International Contract Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
Song, H. (PI)
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects