Project Details
Description
The project contains four tasks. Party A is responsible for all 4 Tasks. Task 1 is to investigate and integrate knowledge, evidence, and barriers based on natural solutions to address current urban water and soil challenges. Party A also responsible for task 2 is to remediate urban water pollutants via NBS. Party A is also responsible for task 3 is to remediate urban soil pollutants via NBS. Task 4 is to co-develop a framework for urban resilience and pollution control framework based on multi-objective optimization. Party B is responsible for co-design, developing and support for Tasks 1 and 3 about the identification of challenges faced by urban soil and water, remediation of soil and water pollutants, and assessment of emissions, migration, distribution, and health effects, especially responsible for the emerging urban flood risk reduction for Task 4 in the project.
Key findings
flood mitigation and urban soil and water pollution control via NBS
Status | Active |
---|---|
Effective start/end date | 1/01/24 → 31/12/26 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.