Projects per year
Search results
-
Energy Efficient Freight Transport Scheduling in Supply Chain Logistics
Bai, R. (PI) & Qu, R. (CoI)
1/04/13 → 31/03/15
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
Yang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
EU-China Innovation Platform on Sustainable Urbanisation (URBAN-EU-CHINA)
Paramor, O. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
EU grant-dragon star Plus-Odette Paramor
Paramor, O. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
European Research and Innovation Centre of Excellence in China (ERICENA)
Paramor, O. (PI)
1/01/16 → 31/12/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Evaluation of Fire-Robot Design
Sun, X. (PI)
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
Ren, Y. (PI)
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fifth International Conference on Offshore Energy and Storage
Galea, M. (PI)
1/09/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
First Principles Derived Equation of States for Carbon Dioxide Capture and Transport
Do, H. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Flavour modification and analytical authentication of composite fruit juices
Sun, Y. (PI)
1/12/18 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
Li, B. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. (CoPI) & Ramadan, A. (PI)
1/01/16 → 1/01/18
Project: Other Projects
-
Four-dimensional Dopant Profiling for Rapid Prototyping and Fabrication of Nanoscale Semiconductor Devices Using Novel Combined SEM / FIB Techniques
Chee, K. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Free Discontinuity Problems and Applications in Fracture Mechanics
Mikayelyan, H. (PI)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Freight service network design optimisation and its applications
Bai, R. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Frequency response analysis of a modular multilevel power converter for multi-terminal HVDC applications
Xu, J. (PI)
1/12/20 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
From Big Data to New Knowledge: Fundamental Technology Research with an Application to Intelligent Logistics Services Platform Development
1/01/12 → 7/01/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Graphene production via the mechanochemical cracking of single-mode microwave pyrolysed biomass
Pang, C. H. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Handling Uncertainties in Transportation and Logistics Using Granular Computing and Hyper-heuristics
Bai, R. (PI), Qu, R. (CoI), Anberree, T. (CoI), Burke, E. K. (CoI) & Bargiela, A. (CoI)
1/09/08 → 31/08/11
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Haze particle physicochemical properties in the Yangtze River Delta, Zhu River Delta
He, J. (PI)
1/07/16 → 30/06/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
How "3S" technologies benefit the Ocean economics
Hancock, C. (PI)
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Hydrodynamics and sediment transport in the swash zone
Zhu, F. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
IAMET Open fund to support PEMC PKL programme
Zhang, X. (PI)
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of multiple dimensional principal stress rotations on soil behavior
Yang, Y. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Improvement of Pilot Training Performance in the Context of Virtual Training Environment
Sun, X. (PI)
Project: Contract Projects › Horizontal-International Contract Projects