Projects per year
Search results
-
AC/DC electric loading simulator for more electric aircraft
Zhang, A. (PI)
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Taylor reactor micro-fine particle liquid-solid two-phase flow transport behavior modulation
Li, G. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Four-dimensional Dopant Profiling for Rapid Prototyping and Fabrication of Nanoscale Semiconductor Devices Using Novel Combined SEM / FIB Techniques
Chee, K. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Freight service network design optimisation and its applications
Bai, R. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Graphene production via the mechanochemical cracking of single-mode microwave pyrolysed biomass
Pang, C. H. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigations of power flow characteristics of nonlinear vibration isolation systems
Yang, J. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Organic laser array based explosive sensor
Chen, F. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Policy and Mechanism Study for Activating and Utilizing the Abandoned Rural House on Taogong Island, Dongqian Lake
Cheshmehzangi, A. (PI)
27/02/17 → 26/02/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Novel reactor industrialization development of precursor of lithium battery anode material
Yang, X. (PI)
1/04/17 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Low -cost Indoor Mobile Mapping for BIM Application
Hancock, C. (PI)
8/05/17 → 31/08/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Development and project demonstration of large-scale coal water slurry gasification
Wu, T. (PI)
1/07/17 → 30/04/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and engineering demonstration of novel efficient dust removal technologies in coal-fired power plant
Wu, T. (PI)
1/07/17 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Precursors synthesis process and stintering process optimization
Li, G. (PI)
1/08/17 → 30/09/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Advanced Laser Project
Wang, J. (PI)
1/09/17 → 31/08/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Key Technology of Bridge Deformation Monitoring Based on Multi-Frequency BDS / GPS
Hancock, C. (PI)
1/10/17 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Robust Data Mining Technologies and Their Applications in Cold Chain Logistics Big Data Analytics
Bai, R. (PI)
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Coating on metal for marine anticorrosion application
Hu, B. (PI)
1/12/17 → 30/11/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
light-weight and high-strength SMC Composites Materials
Liu, X. (PI)
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
How "3S" technologies benefit the Ocean economics
Hancock, C. (PI)
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
CEE Key discpline fund_Chemical engineering and technology
Hall, P. (PI)
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The design and controllable synthesis of coal-fired flue gas Hg0 and SOx transfer catalyst and its mechanism study
Zhao, H. (PI), Xu, M. (CoI) & Yang, G. (CoI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
Li, B. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Basic research of ironless core two axis compensated compulsators;
Zhao, W. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
Hu, D. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
soil properties under double non-coaxiality and principal stress rotation
Yang, Y. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
Chen, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
A wearable medical sensor design with an integrated ultra-low power DSP ASIC for motion recognition and position tracking
Ni, W. (PI)
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Qualitative Spatial Logics for Validating Matches between Spatial Objects
Du, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Numerical simulation and experimental study of flash boiling spray characteristic of direct injection gasoline engine
Zhang, X. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on High-Power-Density Multi-Phase/Multi-Level Converters for Marine Propulsion System
Gu, C. (PI)
1/01/18 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The key studies of Satellite-difference RTK PPP applied in huge bridge deformation
Tang, X. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
Xu, M. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Decision support system for smart healthcare services
Bai, R. (PI)
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Hydrodynamics and sediment transport in the swash zone
Zhu, F. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Design Optimization of Dual-Active-Bridge Power Converters for Energy Recovery Applications
Gu, C. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
An investigation into predictive modelling of the impact of air pollution on China’s disease burden
Yang, J. (PI)
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
"Investigation on gas-liquid-solid three phase flow coupled with meso-scale particle-bubble interactions, particle-liquid turbulence and bubble induced turbulence in bubble column reactors"
Yang, X. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on development guideline of China's new smart city, based on digital technologies
Tang, L. (PI)
3/01/18 → 30/05/18
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Power Tools Design
Shih, Y. T. (PI)
1/03/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Technical development of thermoplastic composites
Liu, X. (PI)
30/03/18 → 30/09/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Thermochromic window Filim curing project
Yu, L. (PI)
1/04/18 → 30/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Calculation and analysis of soil displacement caused by stopping of tunnel shield machine
Yang, Y. (PI)
11/05/18 → 10/05/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
CIBSE support fund
Xia, L. (PI)
31/05/18 → 31/05/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Research on an integrated technology of reclaiming drilling sludge and slag in highway construction
Wang, J. (PI)
7/06/18 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects