Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
Li, H. (PI)
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Cognitive Research on creating kids art product process
Shih, Y. T. (PI)
1/12/18 → 31/08/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Power Tools Design
Shih, Y. T. (PI)
1/03/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
光固化树脂脱附处理技术研发
Zhu, G. (PI)
Ningbo Shisheng Technology Co., Ltd
17/08/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Key Technology of Bridge Deformation Monitoring Based on Multi-Frequency BDS / GPS
Hancock, C. (PI)
1/10/17 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-2-IAMET Project-3315 Innovation team (Project 2)_George Chen
Chen, G. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-5.4- IAMET Project-Staff Development and Research Fund _HeZhang
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.08.01.4042-2012-2013 Energy and low income tropical housing-EPSRC/DFID-Ali Cheshmehzangi
Cheshmehzangi, A. (PI)
Engineering and Physical Sciences Research Council
17/10/14 → 16/10/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Mobile phone acquisition data crawling and data structure system
Zhang, Q. (PI)
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Organic laser array based explosive sensor
Chen, F. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Mechanism of coupling between fluid dynamics and chemical reaction in the process of synthesising of micro fine powder materials using combined reactors and the process control
Yang, X. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Bilateral Workshop on Fundamental Study and Applications of Micro/nano Scale Multiphase Thermal and Mass Transport
Ren, Y. (PI)
1/04/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
EU-China Innovation Platform on Sustainable Urbanisation (URBAN-EU-CHINA)
Paramor, O. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
An investigation of composite aircraft fire protection
Liu, X. (PI)
1/01/17 → 31/12/19
Project: Contract Projects › Horizontal-International Contract Projects
-
A wearable medical sensor design with an integrated ultra-low power DSP ASIC for motion recognition and position tracking
Ni, W. (PI)
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigations of power flow characteristics of nonlinear vibration isolation systems
Yang, J. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
An investigation into predictive modelling of the impact of air pollution on China’s disease burden
Yang, J. (PI)
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Taylor reactor micro-fine particle liquid-solid two-phase flow transport behavior modulation
Li, G. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Development of a new and robust hybrid data processing algorithm for a low-cost integrated sensor indoor positioning system
Lau, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
EU grant-dragon star Plus-Odette Paramor
Paramor, O. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Content service for the construction of medical question answering system knowledge base
Bai, R. (PI)
16/01/19 → 15/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Thermochromic window Filim curing project
Yu, L. (PI)
1/04/18 → 30/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Thermoplastic composite reinforced by continues fibres by fasting processing
Liu, X. (PI)
1/01/19 → 31/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Planetary Mixer Design
Gill, A. (PI)
31/10/19 → 29/02/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Key technical research on thermal management of gasoline direct-injection engine used vehicle
Shi, Y. (PI)
1/03/15 → 31/03/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ambient Temperature High Speed Electrical Drive System Development Technology Agreement
Galea, M. (PI)
1/09/19 → 30/04/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Calculation and analysis of soil displacement caused by stopping of tunnel shield machine
Yang, Y. (PI)
11/05/18 → 10/05/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Haze particle physicochemical properties in the Yangtze River Delta, Zhu River Delta
He, J. (PI)
1/07/16 → 30/06/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
Yang, X. (PI)
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The 9th Multidiscipliany International Scheduling Conference (MISTA)
Bai, R. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
PM2.5Pollution Levels and Influencing Factors of Environmentally Persistent Free Radicals (EPFRs) on PM2.5
Xu, M. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Damage detection of bridge structures subjected to nonlinear effects of changing ambient temperature condition
Chen, Y.-T. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The Green Synthesis of Fit-for-purpose Catalysts for the Pyrolytic Conversion of Municipal Solid Wastes (MSW) using Unwanted Power Station Ash
Pang, C. H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Marine Composites Development and Manufacturing for Sustainable Environment
Liu, X. (PI)
1/10/15 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on basic issues of modular electrical machines with low torque ripple based on the carrier phase shift strategy
Zhao, W. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
5G-V2X adaptive and predictive handover scheme based on reinforced learning5G
Kwong, C. F. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects