Thermoplastic composite reinforced by continues fibres by fasting processing
Liu, X. (PI)
1/01/19 → 31/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Temperature-sensitive electrolytes with reversible self-protection mechanism for lithium-ion battery
Xia, L. (PI)
1/01/19 → 30/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
First Principles Derived Equation of States for Carbon Dioxide Capture and Transport
Do, H. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
Wang, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
Li, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Control strategies of an Electro-mechanical braking system for automotives
Xu, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Investigation of micro-plastics in the Chinese urban river catchment: the case of Ningbo
Chan, F. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Enhancement of Molten Salt Electro-Deoxidation Process for Titanium Alloys Production via the Application of Metal Co-Oxide Cathodes
Hu, D. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Content service for the construction of medical question answering system knowledge base
Bai, R. (PI)
16/01/19 → 15/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Application of PEI-Veil in flame-retardant and Toughened Composite Materials PEI-Veil
Liu, X. (PI)
14/02/19 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Capital market database development
Lu, J. (PI)
1/03/19 → 31/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
Li, B. (PI)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
Pang, C. H. (PI)
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Bilateral Workshop on Fundamental Study and Applications of Micro/nano Scale Multiphase Thermal and Mass Transport
Ren, Y. (PI)
1/04/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
Yi, X. (PI)
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Mobile phone acquisition data crawling and data structure system
Zhang, Q. (PI)
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Key technological enhancement and applications for Ningbo port Terminal operating system
Bai, R. (PI)
30/06/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Ningbo specific passive house technical guidance
Deng, W. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
Yang, J. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Multi-fuel, high reliable solid oxide fuel cell stack technology
Konysheva, E. (PI)
1/07/19 → 1/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Resource Recycling Technology Research and Demonstration for Retired Power Batteries
Hall, P. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
Chen, H. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
Shi, Y. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
有机固废的高效清洁能源化转化技术
Liu, S. (PI)
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
Yang, Y. (PI)
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
Li, H. (PI)
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
NMI_3315 Innovation Team_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Zhu, G. (PI)
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Ambient Temperature High Speed Electrical Drive System Development Technology Agreement
Galea, M. (PI)
1/09/19 → 30/04/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
NMI_3315 Innovation Team Talent Fund_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Zhu, G. (PI)
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research and Development of Alternative Feeding Antibiotic Products from Herbs
Tang, B. (PI)
30/09/19 → 31/07/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Planetary Mixer Design
Gill, A. (PI)
31/10/19 → 29/02/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Solution for the information system of the building structure and its components
Lu, J. (PI)
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
DOMINANT: Development of an Efficient Plug-n-Play and Real-Time Remote Health Monitoring System;
Kar, P. (PI)
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on control techniques of multi-phase fault-tolerant machines
Buticchi, G. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
Gu, C. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Servo Actuator Thermal Analysis
Zhang, X. (PI)
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
Yang, X. (PI)
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
The technological development of 1.5T cryogen-free low-temperature superconductive magnet1.5T
Wang, C. (PI)
1/12/19 → 30/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
Deng, W. (PI)
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Preparation of high voltage - high density capacitor from electrolytic tantalum powder
Hu, D. (PI)
1/01/20 → 31/12/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Galbraith Mechanism -Theory and Experiments
Luckraz, S. (PI)
1/01/20 → 28/11/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
Wu, T. (PI)
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects