Projects per year
Search results
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Architecture prototyping based energy retrofit for office buildings
Deng, W. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Embedded Wearable Sensors for Firefighter Safety Assessment and Applications
Lee, B. G. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Overseas Ningbo Memory 1200
1/06/21 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
86 model Windows System
Mangi, E. (PI)
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
3D Digitalization for the Historic Site of Zhejiang Custom House in Ningbo
Xie, J. (PI)
22/06/21 → 10/03/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI)
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
Wu, T. (PI)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Research and Development of Incubator Noise Reduction and Photoelectric Sensor Technology
Wang, C. (PI)
3/08/21 → 17/02/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Platform Application for Innovation China
Tang, B. (PI)
1/09/21 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W. (PI), Xu, M. (CoI), Fow, K. L. (CoI) & Sun, Y. (CoI)
1/09/21 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J. (PI), Lu, J. (PI), Zhou, T. (PI) & Deng, W. (PI)
9/09/21 → 24/06/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
Wu, T. (PI)
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
UNNC x HoB Storage Design
Gill, A. (PI)
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The stochastic epidemic model driven by α-stable process and its application
Cai, Y. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
Wang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
Wang, J. (PI)
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
Yang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
Yang, J. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI), Li, B. (CoI) & Kow, K. W. (CoI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Intelligent Cockpit Concept Design
Sun, X. (PI)
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
Zhang, Z. (PI)
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Technology and Culture Symposium
Mangi, E. (PI), Botti, G. (CoPI), Chen, W. (CoI) & Shinohara, H. (CoPI)
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Design and development of a Massage Chair
Sun, X. (PI)
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
Yang, J. (PI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D. (PI), Mareta, S. (CoI), Ran, L. (CoI), Xu, J. (CoI), Huang, L. (CoI) & Lin, T. (CoI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
Shi, Y. (PI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
Gill, A. (PI)
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
Wu, T. (PI)
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J. (PI), Lu, J. (CoI), Deng, W. (PI) & Zhou, T. (PI)
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Alzheimer's Disease Care Respite Technology
Sun, X. (PI)
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
File -
Ningbo Key Laboratory of Digital Port Technologies
Bai, R. (PI), Chong, A. (CoI), Ren, J. (CoI) & Dong, N. (CoI)
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Key Technologies of Collaborative AGV Scheduling for Complex Digital Twin Systems
Bai, R. (PI), Ren, J. (CoI), Yao, Y. (CoI) & ULLAH, F. (CoI)
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Nansongyan Rural Beautification Landscape Design
Mangi, E. (PI) & Palmioli, A. (CoI)
1/08/23 → 30/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Ningbo Key Unmovable Heritage Smart Preservation and Traditional Art Inheritance
Deng, W. (PI), Liu, J. (CoI), Zhou, T. (CoI), Xie, J. (CoI), Ren, J. (CoI), Botti, G. (CoI), Loo, Y. M. (CoI), Zahran, E. S. M. M. (CoI), Zipprich, A. (CoI), Liang, R. (CoI) & Sima, Y. (CoI)
1/08/23 → 31/07/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
Xie, J. (PI), Zhou, T. (CoI) & Lu, J. (CoI)
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and application of robot scheduling system for hospital logistics
1/09/23 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
The First Yang Ming Cultural and Creative Design Competition
Wu, J. (PI)
16/10/23 → 31/05/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Lighting Design for EU Market based on integration of Industry and Education
Liu, B. (PI)
15/11/23 → 6/11/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects