Projects per year
Search results
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Galbraith Mechanism -Theory and Experiments
Luckraz, S. (PI)
1/01/20 → 28/11/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
Fu, P. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
Huang, L. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
Zhang, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
The 9th Multidiscipliany International Scheduling Conference (MISTA)
Bai, R. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
Feng, M. (PI)
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
User’s Water Drinking Behavior and Related Product Design Research
Liu, B. (PI)
1/04/20 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Fire-Robot Design
Sun, X. (PI)
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Development and test of high-speed induction motor drive system
Galea, M. (PI)
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Low Frequency Vibration Acquisition Technology of Wind Turbine Based on GPS
Chen, Y.-T. (PI)
15/07/20 → 15/05/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
the Joint Research Centre in Advanced Materials Technology
Liu, X. (PI)
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
Xie, J. (PI)
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
International Conference on Resource Sustainability – “Sustainable Urbanisation” in the BRI Era
Chan, F. (PI)
31/08/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Yolanda Personal Care Appearance and Structure Design
Gill, A. (PI)
30/09/20 → 30/05/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
International Conference on Applied Energy
Wu, T. (PI)
1/10/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
International Workshop on Green Airports Technologies
Buticchi, G. (PI)
12/10/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Application and Implementation of AI Algorithm in HVAC
Zhang, Z. (PI)
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Design and Development of High Precision Mini Home Use Instrumentation “
Sun, X. (PI)
20/10/20 → 20/10/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Physical simulation and active control of interface defects in drilling of CFRP/alloy laminated structure CFRP-
Liu, G. (PI)
1/11/20 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
Halim, D. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
Yi, X. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
Tang, B. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Oxidative potential on atmospheric particulate matter and its source apportionment in Ningbo city
He, J. (PI)
15/11/20 → 15/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020
Ren, Y. (PI)
1/12/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Frequency response analysis of a modular multilevel power converter for multi-terminal HVDC applications
Xu, J. (PI)
1/12/20 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Multi-phase Motor Drive Technology for Multil-wing Drone
Li, J. (PI)
7/12/20 → 30/06/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Intelligent Investigation Assistant System Using NLP
Zhang, Q. (PI)
10/12/20 → 9/12/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
An Alternative Pathway for the Sustainable Development: The development of Campus-based Sustainability Assessment Tool (CSAT) for Chinese Cities
Dawodu, A. (PI)
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Model and Data Driven Hyper-Heuristics for Combinatorial Optimization and Their Applications in Port Operation Integrated Scheduling
Bai, R. (PI)
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
Zhang, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D on Solid Waste Green Processing Technology and Equipment-harmless and resource disposal technology and equipment for pharmaceutical sludge based on microwave pyrolysis - catalytic reforming
Wu, T. (PI), Xu, M. (CoI) & Luo, X. (CoI)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Smart AI for Firefighters Safety Assessment
Lee, B. G. (PI)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Reconstructing the origin and spread of Asian rice based on Geographic Information System and Bayesian modelling
Long, T. (PI)
1/02/21 → 31/01/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
Ren, Y. (PI)
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Indoor Localization Mapping with Sensor Fusion
Lee, B. G. (PI)
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
IAMET Open fund to support PEMC PKL programme
Zhang, X. (PI)
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
Deng, W. (PI)
1/04/21 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects