Projects per year
Search results
-
Cognitive Research on creating kids art product process
Shih, Y. T. (PI)
1/12/18 → 31/08/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Collection and Archiving for the Historical Documents of Zhejiang Old Custom (Phase I)
Xie, J. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
Feng, M. (PI)
1/12/23 → 20/02/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Content service for the construction of medical question answering system knowledge base
Bai, R. (PI)
16/01/19 → 15/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Control strategies of an Electro-mechanical braking system for automotives
Xu, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Creep failure mechanism of the thermal barrier coating systems
Chen, H. (PI)
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Damage detection of bridge structures subjected to nonlinear effects of changing ambient temperature condition
Chen, Y.-T. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Decision support system for smart healthcare services
Bai, R. (PI)
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Deepen Research on the promotion of application of recycled fillers in the "zero waste construction sites"
31/07/24 → 31/07/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Deep-Learning based Multi-Camera Calibration in Laparoscopy
Weng, Y. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
Zhang, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Design and development of a Massage Chair
Sun, X. (PI)
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Design and Development of High Precision Mini Home Use Instrumentation “
Sun, X. (PI)
20/10/20 → 20/10/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and Evaluation of CBTA Instructor Tool
Sun, X. (PI)
1/05/24 → …
Project: Contract Projects › Horizontal-International Contract Projects
-
Design and Evaluation of Virtual Co-pilot System for Pilot Training
Sun, X. (PI)
1/04/25 → 30/04/27
Project: Contract Projects › Horizontal-International Contract Projects
-
Design and study of fluorinated organic solvents with good compatibility on the carbon negative for high-voltage lithium-ion batteries
Xia, L. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design for Yangming Culture Creative Lighting
Wu, J. (PI)
31/07/24 → 31/12/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design of non-carbonate based electrolyte solution and investigation of the formation mechanism of interfacial surface film on the lithium-rich manganese-based cathode for Lithium-ion batteries
Xia, L. (PI)
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Design Research of Power Tools and Guarding Tools based on University-Industry Collaboration Model
Liu, B. (PI)
1/01/24 → 31/12/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Developing a Computational Tool for a Sustainable Assessment of Intelligent Buildings in Saudi Arabia
Reffat, R. (PI), Abdou, A. (CoI) & Budaui, I. (CoI)
1/02/12 → 1/02/14
Project: Other Projects
-
Developing an Integration System to improve the Utilization of Smart Office Building Technologies in Saudi Arabia
Reffat, R. (PI)
1/09/05 → 1/11/06
Project: Other Projects
-
Developing plans for the improvement of campus amenities and services
Reffat, R. (CoPI), Aldossary, A. (PI) & Alnaser, A. (CoI)
1/03/06 → 1/01/07
Project: Other Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
Pang, C. H. (PI)
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development and application of robot scheduling system for hospital logistics
1/09/23 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development and engineering demonstration of novel efficient dust removal technologies in coal-fired power plant
Wu, T. (PI)
1/07/17 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and project demonstration of large-scale coal water slurry gasification
Wu, T. (PI)
1/07/17 → 30/04/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and test of high-speed induction motor drive system
Galea, M. (PI)
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
Gu, C. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a new and robust hybrid data processing algorithm for a low-cost integrated sensor indoor positioning system
Lau, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Development of Application Technology of Digital Technology in Sports Rehabilitation Scenarios
20/01/25 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of a Strategy-based Design Tool for Energy-Efficient Building Envelope of High-Rise Office Buildings in a Hot- Humid Climate
Reffat, R. (PI), Abdou, A. (CoI), Alhammad, A. (CoI), Cetin, M. (CoI), Hamid , S. (CoI) & Raharja , I. P. (CoI)
1/09/09 → 1/07/11
Project: Other Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of high-efficiency and low-pollution anti-corrosion coatings for steel pipeline
Hu, B. (PI)
21/12/15 → 21/12/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
Hu, D. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of low emission waterborne coatings with multi-functional characteristics
Hu, B. (PI)
1/05/14 → 22/05/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
Tang, B. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of multifunctional low-pollution waterborne coatings
Hu, B. (PI)
Ningbo Science and Technology Bureau
23/05/14 → 22/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of rapid water quality detection platform and method using microfluidics
Ren, Y. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
DOMINANT: Development of an Efficient Plug-n-Play and Real-Time Remote Health Monitoring System;
Kar, P. (PI)
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Droplet Fission and Emulsion Templated Microparticle Mechanics in Bifurcated Bilayer Microfluidic System
Ren, Y. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Eco-friendly, high performance and multi-functional green building composites and its application technology
Yi, X. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
Reffat, R. (PI)
1/01/14 → 1/01/16
Project: Other Projects
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Electrochemical Production of Titanium Alloy Powders for 3D Printing
Hu, D. (PI)
Zhejiang University of Science and Technology
18/01/16 → 17/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province