Projects per year
- 1 - 50 out of 369 results
Search results
-
Active
Research and development of new intelligent jacks and intelligent lifts
Liu, B. (PI)
1/12/24 → 30/11/27
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design for Yangming Culture Creative Lighting
Wu, J. (PI)
31/07/24 → 31/12/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Deepen Research on the promotion of application of recycled fillers in the "zero waste construction sites"
31/07/24 → 31/07/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Energy Data Investigation Service Phase III
1/07/24 → …
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Design and Evaluation of CBTA Instructor Tool
Sun, X. (PI)
1/05/24 → …
Project: Contract Projects › Horizontal-International Contract Projects
-
Measurement effect testing of diverticulum area in Med-FAUNet model
He, X. (PI)
1/02/24 → 1/02/26
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Targeting urban flood resilience with Nature-Based Solutions
Chan, F. (PI)
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design Research of Power Tools and Guarding Tools based on University-Industry Collaboration Model
Liu, B. (PI)
1/01/24 → 31/12/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The development and application of the sparse search direction in thresholding-type sparse optimization algorithms
Meng, N. (PI)
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
Feng, M. (PI)
1/12/23 → 10/05/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and application of robot scheduling system for hospital logistics
1/09/23 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
Xie, J. (PI), Zhou, T. (CoI) & Lu, J. (CoI)
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Nansongyan Rural Beautification Landscape Design
Mangi, E. (PI) & Palmioli, A. (CoI)
1/08/23 → 30/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Key Technologies of Collaborative AGV Scheduling for Complex Digital Twin Systems
Bai, R. (PI), Ren, J. (CoI), Yao, Y. (CoI) & ULLAH, F. (CoI)
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Ningbo Key Laboratory of Digital Port Technologies
Bai, R. (PI), Chong, A. (CoI), Ren, J. (CoI) & Dong, N. (CoI)
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D. (PI), Mareta, S. (CoI), Ran, L. (CoI), Xu, J. (CoI), Huang, L. (CoI) & Lin, T. (CoI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
Shi, Y. (PI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
Yang, J. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W. (PI), Xu, M. (CoI), Fow, K. L. (CoI) & Sun, Y. (CoI)
1/09/21 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
NMI_3315 Innovation Team_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Zhu, G. (PI)
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
NMI_3315 Innovation Team Talent Fund_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Zhu, G. (PI)
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Not started
Research and Applications of Search with Evolutionary Ruin and Stochastic Rebuild
Bai, R. (CoI)
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
REducing AirCraft Taxiing emissIons through energy recoVery and storage (REACTIVE)
Zhang, A. (PI)
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Technology and control system development for gasoline powered vehicles to meet emission standard China 6--Database-based emission simulation modeling
He, J. (PI)
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Ningbo InnCity Annual Curation Event
Loo, Y. M. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the Impact of New Technologies in Urban Renewal on Promoting the Development of New Urban Productivity
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Med-FAUNet Model for Ultrasound Image Segmentation
He, X. (PI)
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Improvement of Pilot Training Performance in the Context of Virtual Training Environment
Sun, X. (PI)
Project: Contract Projects › Horizontal-International Contract Projects
-
Creep failure mechanism of the thermal barrier coating systems
Chen, H. (PI)
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Collection and Archiving for the Historical Documents of Zhejiang Old Custom (Phase I)
Xie, J. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Finished
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Lighting Design for EU Market based on integration of Industry and Education
Liu, B. (PI)
15/11/23 → 6/11/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The First Yang Ming Cultural and Creative Design Competition
Wu, J. (PI)
16/10/23 → 31/05/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Alzheimer's Disease Care Respite Technology
Sun, X. (PI)
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
File -
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J. (PI), Lu, J. (CoI), Deng, W. (PI) & Zhou, T. (PI)
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
Wu, T. (PI)
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
Gill, A. (PI)
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
Yang, J. (PI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and development of a Massage Chair
Sun, X. (PI)
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects