Projects per year
- 100 - 150 out of 368 results
Search results
-
Finished
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
Xie, J. (PI)
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
the Joint Research Centre in Advanced Materials Technology
Liu, X. (PI)
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Low Frequency Vibration Acquisition Technology of Wind Turbine Based on GPS
Chen, Y.-T. (PI)
15/07/20 → 15/05/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and test of high-speed induction motor drive system
Galea, M. (PI)
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Fire-Robot Design
Sun, X. (PI)
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
User’s Water Drinking Behavior and Related Product Design Research
Liu, B. (PI)
1/04/20 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
Feng, M. (PI)
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
The 9th Multidiscipliany International Scheduling Conference (MISTA)
Bai, R. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
Zhang, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
Chen, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
Fu, P. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and Development, Test and Industralization of New Smelting Techniques of Titanium ad Titaium Alloys
Hu, D. (PI)
1/01/20 → 1/01/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Preparation of high voltage - high density capacitor from electrolytic tantalum powder
Hu, D. (PI)
1/01/20 → 31/12/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
Li, G. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
Wu, T. (PI)
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
Huang, L. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
Deng, W. (PI)
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The technological development of 1.5T cryogen-free low-temperature superconductive magnet1.5T
Wang, C. (PI)
1/12/19 → 30/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
Yang, X. (PI)
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
Servo Actuator Thermal Analysis
Zhang, X. (PI)
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on control techniques of multi-phase fault-tolerant machines
Buticchi, G. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
Gu, C. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Solution for the information system of the building structure and its components
Lu, J. (PI)
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
DOMINANT: Development of an Efficient Plug-n-Play and Real-Time Remote Health Monitoring System;
Kar, P. (PI)
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Planetary Mixer Design
Gill, A. (PI)
31/10/19 → 29/02/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Research and Development of Alternative Feeding Antibiotic Products from Herbs
Tang, B. (PI)
30/09/19 → 31/07/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
Ambient Temperature High Speed Electrical Drive System Development Technology Agreement
Galea, M. (PI)
1/09/19 → 30/04/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
Li, H. (PI)
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
Yang, Y. (PI)
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
有机固废的高效清洁能源化转化技术
Liu, S. (PI)
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
Chen, H. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Resource Recycling Technology Research and Demonstration for Retired Power Batteries
Hall, P. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi-fuel, high reliable solid oxide fuel cell stack technology
Konysheva, E. (PI)
1/07/19 → 1/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
Yang, J. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo specific passive house technical guidance
Deng, W. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
Shi, Y. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Key technological enhancement and applications for Ningbo port Terminal operating system
Bai, R. (PI)
30/06/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Mobile phone acquisition data crawling and data structure system
Zhang, Q. (PI)
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects