Search concepts
|
Selected filters
|
- 1 - 50 out of 531 results
Search results
-
Active
-
The First Yang Ming Cultural and Creative Design Competition
16/10/23 → 1/07/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
“思政生活化”背景下中外合作高校第二课堂体系建设
15/09/23 → 30/09/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
File -
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Nansongyan Rural Beautification Landscape Design
1/08/23 → 30/09/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Quick guidance on influenza prevention and treatment in children in China
5/06/23 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Ningbo Key Laboratory of Digital Port Technologies
Bai, R., Chong, A., Ren, J. & Dong, N.
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Shaping the Connected Museum-Mixed Reality Museum
1/02/23 → 1/02/24
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Alzheimer's Disease Care Respite Technology
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
File -
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J., Lu, J., Deng, W. & Zhou, T.
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D., Mareta, S., Ran, L., Xu, J., Huang, L. & Lin, T.
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Intelligent Cockpit Concept Design
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Study on the Chinese Innovation Eco-system: From the Perspective of Multi-stage and Multi-dimensional Infrastructure
Liu, M., Tan, K. C., LUO, J., Chan, H. K. & YUAN, R.
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
An investigation into the influencing mechanism of IT-enabled multi-tier supply chain visibility on supply chain resilience
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Solid electrolyte interphase characteristics and long cycle stability mechanism of lithium metal batteries
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The stochastic epidemic model driven by α-stable process and its application
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A.
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
86 model Windows System
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
1/04/21 → 1/04/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Evaluation of building safety signs based on eye tracking technology
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Ningbo Philosophy and Social Science Research Base (cultivation category)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
In situ EC-AFM and synchrotron radiation spectroscopy study of lithium dendrite growth
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
A novel method in tourism demand modelling and forecasting: The use of structured and unstructured data in the era of big data
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Model and Data Driven Hyper-Heuristics for Combinatorial Optimization and Their Applications in Port Operation Integrated Scheduling
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research base on Internationalizing Ningbo's Screen Industries
Zhang, X.
1/01/21 → 31/12/23
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Understanding the Dissemination of Online Health-related Fake Rumors under the Public Health Emergency: From the Perspectives of Information Features and Source Persona
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study on the shear behaviors of asphalt mixtures in a mescoscopic level and shakedown analysis for asphaltic pavements under high temperatures
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Smart AI for Firefighters Safety Assessment
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Hefeng Creative Lab Phase II
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D on Solid Waste Green Processing Technology and Equipment-harmless and resource disposal technology and equipment for pharmaceutical sludge based on microwave pyrolysis - catalytic reforming
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research Base on Ningbo Dual Circulation and New Economic Development
1/01/21 → 31/12/23
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Mechanism on microwave-coupled structured catalysts synergistically enhance the gas-solid catalytic reaction
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Guideline Development of PCV Vaccine Implementation
Hubbard, R. & Xia, J.
18/12/20 → 31/12/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province