Projects per year
Search results
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
Chen, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigating Patterns of Architectural Features in Saudi Contemporary Architecture using Data Mining: Case Study (Riyadh, Jeddah, Dammam)
Reffat, R. (PI)
1/10/07 → 1/10/09
Project: Other Projects
-
Internet+ Smart Triage Tool and its application in Ningbo Hospital
LU, Z. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Workshop on Green Airports Technologies
Buticchi, G. (PI)
12/10/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020
Ren, Y. (PI)
1/12/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
Wu, T. (PI)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Conference on Resource Sustainability – “Sustainable Urbanisation” in the BRI Era
Chan, F. (PI)
31/08/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Conference on New Energy and Green Chemicals
Wu, T. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Conference on Applied Energy
Wu, T. (PI)
1/10/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
INTERNATIONAL CALL FOR IDEAS AN ORGANIC PERSPECTIVE FOR ROME “A VISION FOR ROME”
Mangi, E. (PI), Palmioli, A. (CoPI), Buticchi, G. (CoI), Cooper, E. (CoI), Zhang, Y. (CoI), Towey, D. (CoI), Chan, F. (CoI), Hamm, N. (CoI), Bie, J. (CoI), Wang, Y. (CoI) & Caruso, G. (CoI)
26/05/25 → …
Project: Other Projects
File -
Interaction Design for Information Encounter In the Context of Research Work
Sun, X. (PI)
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Interaction Design for Information Encounter in the Context of Research Work
Sun, X. (PI)
Ningbo Science and Technology Bureau
1/06/15 → 30/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Intelligent Investigation Assistant System Using NLP
Zhang, Q. (PI)
10/12/20 → 9/12/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Intelligent Cockpit Concept Design
Sun, X. (PI)
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Intelligent Agents for Concept Invention of Design Forms
Reffat, R. (PI)
1/01/03 → 31/12/04
Project: Other Projects
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
Feng, M. (PI)
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovation Design Joint Lab
Sun, X. (PI)
1/01/17 → 31/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Indoor Localization Mapping with Sensor Fusion
Lee, B. G. (PI)
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Indoor Air Pollution Control Technology
He, J. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Improvement of Pilot Training Performance in the Context of Virtual Training Environment
Sun, X. (PI)
Project: Contract Projects › Horizontal-International Contract Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of multiple dimensional principal stress rotations on soil behavior
Yang, Y. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
IAMET Open fund to support PEMC PKL programme
Zhang, X. (PI)
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Hydrodynamics and sediment transport in the swash zone
Zhu, F. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
How "3S" technologies benefit the Ocean economics
Hancock, C. (PI)
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Haze particle physicochemical properties in the Yangtze River Delta, Zhu River Delta
He, J. (PI)
1/07/16 → 30/06/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Handling Uncertainties in Transportation and Logistics Using Granular Computing and Hyper-heuristics
Bai, R. (PI), Qu, R. (CoI), Anberree, T. (CoI), Burke, E. K. (CoI) & Bargiela, A. (CoI)
1/09/08 → 31/08/11
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Graphene production via the mechanochemical cracking of single-mode microwave pyrolysed biomass
Pang, C. H. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
From Big Data to New Knowledge: Fundamental Technology Research with an Application to Intelligent Logistics Services Platform Development
1/01/12 → 7/01/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Frequency response analysis of a modular multilevel power converter for multi-terminal HVDC applications
Xu, J. (PI)
1/12/20 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Freight service network design optimisation and its applications
Bai, R. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects