Projects per year
Search results
-
Free Discontinuity Problems and Applications in Fracture Mechanics
Mikayelyan, H. (PI)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Four-dimensional Dopant Profiling for Rapid Prototyping and Fabrication of Nanoscale Semiconductor Devices Using Novel Combined SEM / FIB Techniques
Chee, K. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. (CoPI) & Ramadan, A. (PI)
1/01/16 → 1/01/18
Project: Other Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
Li, B. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Flavour modification and analytical authentication of composite fruit juices
Sun, Y. (PI)
1/12/18 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
First Principles Derived Equation of States for Carbon Dioxide Capture and Transport
Do, H. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Fifth International Conference on Offshore Energy and Storage
Galea, M. (PI)
1/09/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
Ren, Y. (PI)
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Fire-Robot Design
Sun, X. (PI)
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
European Research and Innovation Centre of Excellence in China (ERICENA)
Paramor, O. (PI)
1/01/16 → 31/12/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
EU grant-dragon star Plus-Odette Paramor
Paramor, O. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
EU-China Innovation Platform on Sustainable Urbanisation (URBAN-EU-CHINA)
Paramor, O. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
Yang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Energy Efficient Freight Transport Scheduling in Supply Chain Logistics
Bai, R. (PI) & Qu, R. (CoI)
1/04/13 → 31/03/15
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Electrochemical Production of Titanium Alloy Powders for 3D Printing
Hu, D. (PI)
Zhejiang University of Science and Technology
18/01/16 → 17/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
Reffat, R. (PI)
1/01/14 → 1/01/16
Project: Other Projects
-
Eco-friendly, high performance and multi-functional green building composites and its application technology
Yi, X. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Droplet Fission and Emulsion Templated Microparticle Mechanics in Bifurcated Bilayer Microfluidic System
Ren, Y. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
DOMINANT: Development of an Efficient Plug-n-Play and Real-Time Remote Health Monitoring System;
Kar, P. (PI)
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of rapid water quality detection platform and method using microfluidics
Ren, Y. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of multifunctional low-pollution waterborne coatings
Hu, B. (PI)
Ningbo Science and Technology Bureau
23/05/14 → 22/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
Tang, B. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of low emission waterborne coatings with multi-functional characteristics
Hu, B. (PI)
1/05/14 → 22/05/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
Hu, D. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of high-efficiency and low-pollution anti-corrosion coatings for steel pipeline
Hu, B. (PI)
21/12/15 → 21/12/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of a Strategy-based Design Tool for Energy-Efficient Building Envelope of High-Rise Office Buildings in a Hot- Humid Climate
Reffat, R. (PI), Abdou, A. (CoI), Alhammad, A. (CoI), Cetin, M. (CoI), Hamid , S. (CoI) & Raharja , I. P. (CoI)
1/09/09 → 1/07/11
Project: Other Projects
-
Development of Application Technology of Digital Technology in Sports Rehabilitation Scenarios
20/01/25 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of a new and robust hybrid data processing algorithm for a low-cost integrated sensor indoor positioning system
Lau, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Development of a high-power multi-phase fault-tolerant machine drive
Gu, C. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development and test of high-speed induction motor drive system
Galea, M. (PI)
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development and project demonstration of large-scale coal water slurry gasification
Wu, T. (PI)
1/07/17 → 30/04/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and engineering demonstration of novel efficient dust removal technologies in coal-fired power plant
Wu, T. (PI)
1/07/17 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects