Search concepts
|
Selected filters
|
- 50 - 100 out of 582 results
Search results
-
Vertical-Zhejiang Provincial Government Funded Projects
Characteristics and source apportionment of urban haze in Hangzhou-Ningbo region
Zhejiang University of Science and Technology
1/06/15 → 31/05/17
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Two-way flow of capital and 2025 China manufacturing
Zhang, Y.
1/11/17 → 15/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Numerical simulation and experimental study of flash boiling spray characteristic of direct injection gasoline engine
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Growth of Digital Venture: A Study on the Effect of Scaling-up Mechanisms and Digital Innovation
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Vertical-Other Provinces and Cities Government Funded Projects
Research on high temperature thermal state performance and refractory liner corrosion characteristics of impinging stream entrained-flow gasifier
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Research on Design Optimization of Dual-Active-Bridge Power Converters for Energy Recovery Applications
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
On the hybrid machining mechanism and machined surface integrity of free-form aerospace surfaces via textured-grinding-wheel-based grinding and loose abrasive polishing
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Numerical Eulerian-Lagrangian Computations of Coupled Gas-liquid-particle Three-phase Flows
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Creep failure mechanism of the thermal barrier coating systems
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Vertical-Ningbo Municipal Government Funded Projects
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on digital twin based key technologies for multi-AGV scheduling and cooperation in complex systems
Bai, R., Ren, J., Yao, Y. & Ullah, F.
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
An investigation of the robustness of transportation scheduling for modern logistics
1/02/08 → 1/02/10
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on application scenarios of Ningbo sci-tech innovation digital reform
30/11/21 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Handling Uncertainties in Transportation and Logistics Using Granular Computing and Hyper-heuristics
Bai, R., Qu, R., Anberree, T., Burke, E. K. & Bargiela, A.
1/09/08 → 31/08/11
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Key Laboratory of Digital Port Technologies
Bai, R., Chong, A., Ren, J. & Dong, N.
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on the organic renewal policy system of Ningbi City
1/06/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of Ningbo to Accelerate the Development of Service Trade
10/12/19 → 30/06/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on Systemic Risk Assessment and Management of Ningbo Financial Market
20/11/18 → 31/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo City International Branding Research
2/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Present situation and policy suggestion of developing quantitative trading industry in Ningbo
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Logistics Service Network Optimisation and Multi-mode Intelligent Container Operations Scheduling
1/06/15 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Semiconductor Nanodevice Characterisation and Fabrication and Rapid Prototyping Using Novel Combined SEM/FIB Techniques
Chee, K.
Ningbo Science and Technology Bureau
1/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on Typical Models and Supporting System for Reconciling SMEs with Large Enterprises
Zhou, M.
18/12/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Promoting Ningbo city internationalization progress: the role played by the government
1/06/17 → 30/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on multi-physics field of high speed high power density electrical machine used for electrical propulsion
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the influence of steel fiber and polyvinyl alcohol fiber concrete on the performance of bridge and bridge end transition slab
Ningbo Science and Technology Bureau
30/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
CEE Key discpline fund_Chemical engineering and technology
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-2-IAMET Project-3315 Innovation team (Project 2)_George Chen
Chen, G.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Mechanism of housing expropriation in Ningbo under the background of urban organic renewal
15/11/19 → 30/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study of Financial Products and Consumer Segmentation
1/09/16 → 31/08/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C.
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Low Carbon Automobile Thermal Management Frontier Technology Innovation Team
1/12/15 → 30/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The 3D Printing Technology and Characterisation of Body Resorbable Composite3D
1/05/16 → 30/04/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-5.4- IAMET Project-Staff Development and Research Fund _HeZhang
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Analysis on the present situation and prospect of service industry for international students in Ningbo
1/11/20 → 31/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Employment and distribution effects of artificial intelligence technology applications
Zhou, M.
1/10/18 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and development of innovative storage techonologies for marine renewable energy
Chen, G.
Ningbo Science and Technology Bureau
1/12/14 → 30/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects