Search concepts
|
Selected filters
|
- 200 - 250 out of 578 results
Search results
-
Vertical-Ningbo Municipal Government Funded Projects
01.03.14.01.2014.04.001-5.1- IAMET Project-Staff Development and Research Fund _Chris Gerada
Gerada, C.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.002-Key technologies research of traction mo
Ningbo Science and Technology Bureau/Finance Bureau
24/05/14 → 23/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
TED X UNNC
Shen, M.
1/07/21 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
From Big Data to New Knowledge: Fundamental Technology Research with an Application to Intelligent Logistics Services Platform Development
Qiu, G. & Bai, R.
1/01/12 → 7/01/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Handling Uncertainties in Transportation and Logistics Using Granular Computing and Hyper-heuristics
Bai, R., Qu, R., Anberree, T., Burke, E. K. & Bargiela, A.
1/09/08 → 31/08/11
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Platform Application for Innovation China
1/09/21 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Technology and control system development for gasoline powered vehicles to meet emission standard China 6--Database-based emission simulation modeling
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Applications of Search with Evolutionary Ruin and Stochastic Rebuild
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-2-IAMET Project-3315 Innovation team (Project 2)_George Chen
Chen, G.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design, Implementation and Evaluation of an Intelligent Dispatching Platform Based on IoT Logistics Technologies
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
File -
CEE Key discpline fund_Chemical engineering and technology
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Financial Inclusion Index based on China Financial Inclusion Index System (2016)
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y.
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of rapid water quality detection platform and method using microfluidics
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Pilot Reform Project-High level Sino-Foreign University Building
1/03/17 → 30/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Probing the excited state photochemistry of key reduced intermediates in photochemical CO2 reduction
Summers, P.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Influence of Non-governmental Organizations on the Sustainable Development of Textile and Apparel Industry in Ningbo
Moosmayer, D.
Ningbo Science and Technology Bureau
1/09/12 → 31/08/13
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of Water Quality in Ningbo In Relation To Land-cover Type
Griffiths, J.
Ningbo Science and Technology Bureau
1/09/14 → 22/07/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
5G-V2X adaptive and predictive handover scheme based on reinforced learning5G
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on active structural vibration control using a compliant actuation mechanism with the passive vibration energy absorption property
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L.
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research Base on Ningbo Dual Circulation and New Economic Development
11/11/20 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Oxidative potential on atmospheric particulate matter and its source apportionment in Ningbo city
15/11/20 → 15/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The Research on the Leverage Effect of Fiscal Policies on Promoting the Development of Capital Market in Ningbo
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design of non-carbonate based electrolyte solution and investigation of the formation mechanism of interfacial surface film on the lithium-rich manganese-based cathode for Lithium-ion batteries
Xia, L.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on how to extend the healthcare international collaboration through the University of Nottingham Ningbo China
Hsieh, C.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
How to build the Meishan New Area under the One belt one road national strategy
1/01/17 → 31/07/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Approaches to improve urban eco-environment quality in Ningbo
1/12/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Reflections and suggestions on the reform of local financial regulatory system in China – using Ningbo as an example
1/09/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The tropospheric delay modeling for improving the PPP precision in the structure monitoring applications
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
New ultra-high-speed 4D nanometer doping detection, drawing and prototyping, manufacturing: FIB-SEM combination process
Chee, K.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R.
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-5.3- IAMET Project-Staff Development and Research Fund _YJ(400k for personal remuneration & 100k for research related activities)
Gerada, C.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Nano fluids of low-dimensional carbon nanomaterials and synthetic organic heat transfer oil
Peng, C.
1/03/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Flavour modification and analytical authentication of composite fruit juices
1/12/18 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on further optimization of enterprise financing environment in Ningbo
Zhou, J.
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on Freshmen Adaptation in Sino-Foreign Universities
Zhou, M.
1/06/18 → 30/06/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Catalytic Cracking Technology for Tar Removal from Waste Pyrolysis Gas
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
High Power Density High Reliability UAV Motor Drive
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Key Lab on Clean Energy Conversion Technologies
1/09/13 → 31/08/15
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A study on the deepening of the reform of the commercial registration system in Ningbo
Ge, J.
14/12/17 → 13/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects