Projects per year
- 300 - 350 out of 361 results
Search results
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
City Tour-Yinzhou district 2023
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J., Lu, J., Zhou, T. & Deng, W.
9/09/21 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W., Zhou, T., Zhang, Z. & Xie, J.
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
R&D on Solid Waste Green Processing Technology and Equipment-harmless and resource disposal technology and equipment for pharmaceutical sludge based on microwave pyrolysis - catalytic reforming
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Smart AI for Firefighters Safety Assessment
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Hefeng Creative Lab Phase II
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Intelligent Cockpit Concept Design
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J., Lu, J., Deng, W. & Zhou, T.
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
1/04/21 → 1/04/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
86 model Windows System
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The First Yang Ming Cultural and Creative Design Competition
16/10/23 → 1/07/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Nansongyan Rural Beautification Landscape Design
1/08/23 → 30/09/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The stochastic epidemic model driven by α-stable process and its application
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Model and Data Driven Hyper-Heuristics for Combinatorial Optimization and Their Applications in Port Operation Integrated Scheduling
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Alzheimer's Disease Care Respite Technology
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
File -
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
1/12/23 → 10/05/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D., Mareta, S., Ran, L., Xu, J., Huang, L. & Lin, T.
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on digital twin based key technologies for multi-AGV scheduling and cooperation in complex systems
Bai, R., Ren, J., Yao, Y. & Ullah, F.
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Targeting urban flood resilience with Nature-Based Solutions
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
REducing AirCraft Taxiing emissIons through energy recoVery and storage (REACTIVE)
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy Data Investigation Service
26/12/23 → …
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Ningbo Key Laboratory of Digital Port Technologies
Bai, R., Chong, A., Ren, J. & Dong, N.
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo InnCity Annual Curation Event
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Lighting Design for EU Market based on integration of Industry and Education
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects