Search concepts
|
Selected filters
|
- 450 - 500 out of 579 results
Search results
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Self-Powered Environment Sensing based on Novel Electret Materials and Flexible Energy-Generating Devices
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Semiconductor Nanodevice Characterisation and Fabrication and Rapid Prototyping Using Novel Combined SEM/FIB Techniques
Chee, K.
Ningbo Science and Technology Bureau
1/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Servo Actuator Thermal Analysis
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Shaping the Connected Museum
Ch'ng, E.
1/08/20 → 31/07/23
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Shaping the Connected Museum-Mixed Reality Museum
Ch'ng, E.
1/02/23 → 1/02/24
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Smart Eco-cities for a green economy: a comparative study of Europe and China
Tan, P. M.
National Natural Science Foundation of China (NSFC)
1/09/14 → 31/08/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Soil behaviour under bidirectional non-coaxiality and principal stress rotation
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
soil properties under double non-coaxiality and principal stress rotation
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Solar-thermochromism of Ionic Liquid-Transition Metal Complexes Based Films and Their Application in Smart Windows
Yu, L.
Zhejiang University of Science and Technology
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Solution for the information system of the building structure and its components
Lu, J.
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Speed Up the Establishment of Ningbo International Chamber of Commerce New Business Models Referring to British Chamber of Commerce Business Model
1/10/17 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
SPMIC-UNNC &Advanced MRI workshop
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Stress state variation and shakedown analysis of trackbed under repeated moving train loads
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C.
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Studies of the Biomimetic Total Synthesis of Providencin
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study of Financial Products and Consumer Segmentation
1/09/16 → 31/08/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study of PMSM Control Strategy with Improved Phase Current Reconstruction Method
Yan, H.
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on countermeasures to further stimulate the vitality of microeconomic subjects and promote the high-quality development of private and small and medium-sized enterprises in Ningbo
1/01/20 → 30/11/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on digital media use and identification with Ningbo city image: Using Expatriates and Chinese returners from overseas to Ningbo as the example
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on how to extend the healthcare international collaboration through the University of Nottingham Ningbo China
Hsieh, C.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on multicomponent thermal diffusion coating and thermal corrosion mechanism of gas turbine turbine blades
Liu, M. & Liu, J.
Project: University Funded Projects › Internal-Others University Funded Projects
-
Study on Systemic Risk Assessment and Management of Ningbo Financial Market
20/11/18 → 31/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the characteristics of Ningbo's economic structure and the path of adjustment and transformation
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the Countermeasures of strengthening the Cooperation of "Belt and Road" International Science and Technology Innovation in Ningbo "
1/05/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the influence of steel fiber and polyvinyl alcohol fiber concrete on the performance of bridge and bridge end transition slab
Ningbo Science and Technology Bureau
30/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the interaction and deformation of a shallow subway tunnel and an overlapping ground road under long-term traffic loads
1/10/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the Reaction Mechanism of Copper-catalyzed Carbon Dioxide Reduction to Small Molecule Fuel by Density Functional Theory (DFT) and the Design of New Catalytic System
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the shear behaviors of asphalt mixtures in a mescoscopic level and shakedown analysis for asphaltic pavements under high temperatures
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study on Typical Models and Supporting System for Reconciling SMEs with Large Enterprises
Zhou, M.
18/12/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y.
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Sustainable Development Goals in Journalism Reporting
15/11/19 → 14/11/22
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Sustainable Economic Development – Zhejiang-UK (Nottinghamshire) Health Industry Network Initiative
Hubbard, R.
1/07/18 → 11/11/18
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
System architecture and platform research on Ningbo internet vehicles
1/09/13 → 31/12/13
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Targeting urban flood resilience with Nature-Based Solutions
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Taylor reactor micro-fine particle liquid-solid two-phase flow transport behavior modulation
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Technical development of thermoplastic composites
30/03/18 → 30/09/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Technology and control system development for gasoline powered vehicles to meet emission standard China 6--Database-based emission simulation modeling
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
TED X UNNC
Shen, M.
1/07/21 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Temperature-sensitive electrolytes with reversible self-protection mechanism for lithium-ion battery
Xia, L.
1/01/19 → 30/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The 32nd Annual Conference of the Asian Finance Association
28/06/20 → 30/06/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects