Search concepts
|
Selected filters
|
- 550 - 579 out of 579 results
Search results
-
Thirteen Five Tourism Plan for Haishu District, Ningbo
24/04/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Tourism Cooperation Between Ningbo and Middle & Eastern European Countries Under the Belt and Road Context
1/08/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M.
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Transnational Comparative study of innovation and entrepreneurship policy support system
Hofman, P.
1/12/16 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Two-way flow of capital and 2025 China manufacturing
Zhang, Y.
1/11/17 → 15/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Understanding the Approach and Mechanism of Business Model Innovation Enabled by Digital Technologies in Zhejiang Province
1/01/21 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Understanding the Dissemination of Online Health-related Fake Rumors under the Public Health Emergency: From the Perspectives of Information Features and Source Persona
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Unified Information System Based Supply Chain Integration and Optimisation for Intermodal Transportation: A Study on Ningbo Port
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Unified Open E-Logistics Standards Diffusion Model for Supply Chain Integrations
National Natural Science Foundation of China (NSFC)
1/04/16 → 31/03/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
UNNC x HoB Storage Design
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
UoN Cascade project Bamboo & Digital Fabrications Techniques - lead Hiroyuke Shinohara
Shinohara, H.
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
User’s Water Drinking Behavior and Related Product Design Research
1/04/20 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
V-ROOM (A Virtual Reality and Augmented Reality Classroom for Teaching and Learning)
1/09/20 → …
Project: University Funded Projects › (Expired) Internal-Seed Funding for Small RKE/Large Research Project
-
Working plan of establishing Ningbo demonstration area to integrate culture and finance
1/03/17 → 31/08/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Workshop of the Evidence-based Healthcare for Elite Chinese Pharmacist
Hubbard, R. & Xia, J.
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Workshop on humanitarian intervention, counterfactual history, and resilience: cross-disciplinary spaces and public policy solutions
6/06/18 → 1/07/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Yolanda Personal Care Appearance and Structure Design
30/09/20 → 30/05/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhijiang Science Forum-2019 International Conference in Evidence-based Healthcare and Clinical Research 2019
Hubbard, R. & Xia, J.
25/10/19 → 10/02/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
光固化树脂脱附处理技术研发
Ningbo Shisheng Technology Co., Ltd
17/08/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
有机固废的高效清洁能源化转化技术
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects