Search concepts
|
Selected filters
|
- 450 - 500 out of 581 results
Search results
-
The Silk Road and Social Fields Theory
Mueller, C.
1/01/21 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of multiple dimensional principal stress rotations on soil behavior
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The “Invisible-Touch” approach: Toward an integrative (Theoretical and practical) System of Strategic Transformation via the "Reverse M&A" by Chinese firms “
Li, P. P.
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on regression testing by multi-information dynamic extraction, fusion, and correlation
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Development, Test and Industralization of New Smelting Techniques of Titanium ad Titaium Alloys
1/01/20 → 1/01/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Effect of char formation on its dielectric property at high temperature in microwave pyrolysis of biomass and study on microwave enhanced mechanism of char surface reaction
Natural Science Foundation of Ningbo
6/01/17 → 1/01/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Reconstructing the origin and spread of Asian rice based on Geographic Information System and Bayesian modelling
1/02/21 → 31/01/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Research and Development of Incubator Noise Reduction and Photoelectric Sensor Technology
3/08/21 → 17/02/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
3D Digitalization for the Historic Site of Zhejiang Custom House in Ningbo
22/06/21 → 10/03/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Integrating Ergonomics into the Design and Autonomous Driving System
1/04/21 → 31/03/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Guidelines for nutritional treatment of adult sepsis patients
13/04/23 → 1/05/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Researching the participation of universities and colleges in the education of the elderly.
18/05/22 → 18/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Embedded Wearable Sensors for Firefighter Safety Assessment and Applications
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Architecture prototyping based energy retrofit for office buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. & Yousef, W.
2/12/20 → 2/06/23
Project: Other Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z., Deng, W. & Zhou, T.
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
National Guideline for the CRO Treatment and Prevention
Hubbard, R. & Xia, J.
1/08/21 → 30/06/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
A Research on the Image of Scholars and University Spirit in Academic Novels
30/08/21 → 30/06/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of International Clinical Practice Guide, Technical Specification and Service Standard for Acupuncture and moxibustion
Hubbard, R.
20/12/19 → 30/06/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Shaping the Connected Museum
Ch'ng, E.
1/08/20 → 31/07/23
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Impacts of Inequality on Social Cohesion and Individual Contribution to Public Funds
Lane, T.
1/10/20 → 31/07/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
the Joint Research Centre in Advanced Materials Technology
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
International Expert Consensus on the Treatment of Rheumatoid Arthritis with Tripterygium Wilfordii
20/03/23 → 31/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Technology and Culture Symposium
Mangi, E., Botti, G., Chen, W. & Shinohara, H.
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Other Projects
-
Indoor Localization Mapping with Sensor Fusion
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Application and Implementation of AI Algorithm in HVAC
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
City Tour-Yinzhou district 2023
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J., Lu, J., Zhou, T. & Deng, W.
9/09/21 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W., Zhou, T., Zhang, Z. & Xie, J.
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Job Creation and Destruction: Study on Mechanism and Empirics of the Effects of Digital Trade in China
Zhou, M.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
A Study of Digital Innovation Mechanisms for Digital Start-ups Extension
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research Base on Ningbo Dual Circulation and New Economic Development
1/01/21 → 31/12/23
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Study on the shear behaviors of asphalt mixtures in a mescoscopic level and shakedown analysis for asphaltic pavements under high temperatures
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
In situ EC-AFM and synchrotron radiation spectroscopy study of lithium dendrite growth
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects