Search concepts
|
Selected filters
|
- 200 - 250 out of 581 results
Search results
-
Vertical-Ningbo Municipal Government Funded Projects
有机固废的高效清洁能源化转化技术
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of building the international talent community in Ningbo
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on the Prospect of " 16+1 " Trade and Economic Cooperation Demonstration Zone in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Researching the participation of universities and colleges in the education of the elderly.
18/05/22 → 18/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Technology and control system development for gasoline powered vehicles to meet emission standard China 6--Database-based emission simulation modeling
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on application scenarios of Ningbo sci-tech innovation digital reform
30/11/21 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Architecture prototyping based energy retrofit for office buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Financial Inclusion Index based on China Financial Inclusion Index System (2016)
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C.
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the current situation of corporate leverage and the path of deleveraging
1/06/17 → 31/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of multifunctional low-pollution waterborne coatings
Ningbo Science and Technology Bureau
23/05/14 → 22/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Mechanism of housing expropriation in Ningbo under the background of urban organic renewal
15/11/19 → 30/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The development and application of recycled polymeric composites for marine applications
1/12/14 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Robust Data Mining Technologies and Their Applications in Cold Chain Logistics Big Data Analytics
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The 3D Printing Technology and Characterisation of Body Resorbable Composite3D
1/05/16 → 30/04/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Probing the excited state photochemistry of key reduced intermediates in photochemical CO2 reduction
Summers, P.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Analysis on the present situation and prospect of service industry for international students in Ningbo
1/11/20 → 31/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and development of innovative storage techonologies for marine renewable energy
Chen, G.
Ningbo Science and Technology Bureau
1/12/14 → 30/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Influence of Non-governmental Organizations on the Sustainable Development of Textile and Apparel Industry in Ningbo
Moosmayer, D.
Ningbo Science and Technology Bureau
1/09/12 → 31/08/13
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Policies on Patent, business, economy in US, EU, Japan and South Korea
Ningbo Science and Technology Bureau
1/04/16 → 1/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of Water Quality in Ningbo In Relation To Land-cover Type
Griffiths, J.
Ningbo Science and Technology Bureau
1/09/14 → 22/07/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-5.4- IAMET Project-Staff Development and Research Fund _HeZhang
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
An investigation on the influence of the manufacturing techniques on the mechanical properties of glass fibre reinforced polymer composites
Lu, J.
1/10/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo’s internationalization strategy and its role in the Belt Road Initiative
Tan, P. M.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-5.2- IAMET Project-Staff Development and Research Fund _George Chen
Gerada, C.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Comparative Study on Chinese and British Characteristic Towns to Promote Advanced Manufacturing Industry
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The influence of trade barrier on the performance and innovation ability of Chinese enterprises
1/09/18 → 9/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The Green Synthesis of Fit-for-purpose Catalysts for the Pyrolytic Conversion of Municipal Solid Wastes (MSW) using Unwanted Power Station Ash
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
How to build the Meishan New Area under the One belt one road national strategy
1/01/17 → 31/07/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo City International Branding Research
2/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Numerical Eulerian-Lagrangian Simulations of Fully Coupled Gas-liquid-particle Three-phase Flows
Ningbo Science and Technology Bureau
1/06/13 → 31/05/15
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Impact of Financial Inclusion on Systematic Risk
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the current situation of International quality Educational Resources in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Quantifying the impacts and risk of Typhoon related flooding in Ningbo
1/07/14 → 30/06/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on Freshmen Adaptation in Sino-Foreign Universities
Zhou, M.
1/06/18 → 30/06/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Catalytic Cracking Technology for Tar Removal from Waste Pyrolysis Gas
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects