Search concepts
|
Selected filters
|
- 300 - 350 out of 615 results
- Export search results
Search results
-
Impact of multiple dimensional principal stress rotations on soil behavior
Yang, Y. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on high temperature thermal state performance and refractory liner corrosion characteristics of impinging stream entrained-flow gasifier
Wu, T. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
Li, B. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Control strategies of an Electro-mechanical braking system for automotives
Xu, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
Li, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
Wang, C. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
The Enhancement of Molten Salt Electro-Deoxidation Process for Titanium Alloys Production via the Application of Metal Co-Oxide Cathodes
Hu, D. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study on Typical Models and Supporting System for Reconciling SMEs with Large Enterprises
Zhou, M. (PI)
18/12/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Ningbo high-level participation in the Yangtze River Delta integration
Hua, X. (PI)
5/12/18 → 31/03/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Eco-friendly, high performance and multi-functional green building composites and its application technology
Yi, X. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of rapid water quality detection platform and method using microfluidics
Ren, Y. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Deep-Learning based Multi-Camera Calibration in Laparoscopy
Weng, Y. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The tropospheric delay modeling for improving the PPP precision in the structure monitoring applications
Chen, Y.-T. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Internet+ Smart Triage Tool and its application in Ningbo Hospital
LU, Z. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flavour modification and analytical authentication of composite fruit juices
Sun, Y. (PI)
1/12/18 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Cognitive Research on creating kids art product process
Shih, Y. T. (PI)
1/12/18 → 31/08/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The diplomacy of the Belt and Road Initiative
Smith, N. (PI)
30/11/18 → 31/07/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Study on Systemic Risk Assessment and Management of Ningbo Financial Market
Hua, X. (PI)
20/11/18 → 31/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
the development of a novel integrated system for the maximum recovery and concentration of metal and plastics from waste electrical and electronic equipment
Wu, T. (PI)
Ministry of Science and Technology (MoST)
31/10/18 → 1/05/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Developing a platform for micro-film distribution in China for UK creative industries
Gilardi, F. (PI)
17/10/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Industrial Development and Resource Allocation Based on Intellectual Property in Ningbo Marine High-tech Industry
Hua, X. (PI)
9/10/18 → 31/10/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zizhu Audio-Visual Research Center Research Grants
Ryu, S. (PI)
1/10/18 → 30/04/20
Project: Other Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Soil behaviour under bidirectional non-coaxiality and principal stress rotation
Yang, Y. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
5G-V2X adaptive and predictive handover scheme based on reinforced learning5G
Kwong, C. F. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M. (PI)
1/10/18 → 30/09/23
Project: Other Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M. (PI)
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Damage detection of bridge structures subjected to nonlinear effects of changing ambient temperature condition
Chen, Y.-T. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Employment and distribution effects of artificial intelligence technology applications
Zhou, M. (PI)
1/10/18 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
SPMIC-UNNC &Advanced MRI workshop
Wang, C. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on basic issues of modular electrical machines with low torque ripple based on the carrier phase shift strategy
Zhao, W. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
PM2.5Pollution Levels and Influencing Factors of Environmentally Persistent Free Radicals (EPFRs) on PM2.5
Xu, M. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on the interaction and deformation of a shallow subway tunnel and an overlapping ground road under long-term traffic loads
Wang, J. (PI)
1/10/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
International Conference on New Energy and Green Chemicals
Wu, T. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
An investigation on the influence of the manufacturing techniques on the mechanical properties of glass fibre reinforced polymer composites
Lu, J. (PI)
1/10/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
A study on the overall mechanism of leadership traits to organizational paradox in Strategic Entrepreneurship: emergence, response and dynamic evolution
Fu, P. (PI)
1/10/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Green Synthesis of Fit-for-purpose Catalysts for the Pyrolytic Conversion of Municipal Solid Wastes (MSW) using Unwanted Power Station Ash
Pang, C. H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Key Technology and Application demonstration of HPP Natural Fruit and vegetable Juice processing HPP
Sun, Y. (PI)
30/09/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The effects of interdiffusion between TBCs and single crystal superalloys on the mechanical characteristics
Chen, H. (PI)
1/09/18 → 31/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Reflections and suggestions on the reform of local financial regulatory system in China – using Ningbo as an example
Hua, X. (PI)
1/09/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
The influence of trade barrier on the performance and innovation ability of Chinese enterprises
Hua, X. (PI)
1/09/18 → 9/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
Song, H. (PI)
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Design and Development of Replenishment Strategy Module for Smart Robotic Warehouse System
Chan, H. K. (PI)
1/09/18 → 31/07/20
Project: Contract Projects › Horizontal-International Contract Projects
-
Fifth International Conference on Offshore Energy and Storage
Galea, M. (PI)
1/09/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
光固化树脂脱附处理技术研发
Zhu, G. (PI)
Ningbo Shisheng Technology Co., Ltd
17/08/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects