Search concepts
|
Selected filters
|
- 50 - 100 out of 612 results
- Export search results
Search results
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
Wu, T. (PI)
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Chinese Clinic Guideline for Treatment and Prevention of Whooping Cough
Hubbard, R. (CoI) & Xia, J. (PI)
17/10/22 → 30/07/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
PDMxFT: Product Design and Manufacture x Furry Tail
Gill, A. (PI)
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
Yang, J. (PI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
Shi, Y. (PI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D. (PI), Mareta, S. (CoI), Ran, L. (CoI), Xu, J. (CoI), Huang, L. (CoI) & Lin, T. (CoI)
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and development of a Massage Chair
Sun, X. (PI)
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Researching the participation of universities and colleges in the education of the elderly.
Ng, A. (CoI)
18/05/22 → 18/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Building Technology and Culture Symposium
Mangi, E. (PI), Botti, G. (CoPI), Chen, W. (CoI) & Shinohara, H. (CoPI)
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
Zhang, Z. (PI)
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Intelligent Cockpit Concept Design
Sun, X. (PI)
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The stochastic epidemic model driven by α-stable process and its application
Cai, Y. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Solid electrolyte interphase characteristics and long cycle stability mechanism of lithium metal batteries
Shen, C. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
Wang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
Yang, J. (PI)
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Examining the pathways and mechanisms of digital servitization in Zhejiang manufacturing firms
Jiang, Y. (PI) & Makam, S. B. (CoI)
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
An investigation into the influencing mechanism of IT-enabled multi-tier supply chain visibility on supply chain resilience
Pu, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Study on the Chinese Innovation Eco-system: From the Perspective of Multi-stage and Multi-dimensional Infrastructure
Liu, M. (PI), Tan, K. C. (CoI), LUO, J. (CoI), Chan, H. K. (CoI) & YUAN, R. (CoI)
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
Yang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
Wang, J. (PI)
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI), Li, B. (CoI) & Kow, K. W. (CoI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
International Association of Cultural and Creative Industry Research (IACCIR) Grants
Ryu, S. (PI)
1/12/21 → 31/05/23
Project: Other Projects
-
Research on application scenarios of Ningbo sci-tech innovation digital reform
Jiang, Y. (PI) & Makam, S. B. (CoI)
30/11/21 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Comparison Study of Talent Strategy in Ningbo Leading Companies and International Bench-marking Companies
Feng, X. (PI) & Wang, L. (CoPI)
28/10/21 → 27/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
UNNC x HoB Storage Design
Gill, A. (PI)
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
Wu, T. (PI)
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J. (PI), Lu, J. (PI), Zhou, T. (PI) & Deng, W. (PI)
9/09/21 → 24/06/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Platform Application for Innovation China
Tang, B. (PI)
1/09/21 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Collection narration in the cross media: a study based on the collection of Ningbo Bang Museum
Gilardi, F. (PI)
1/09/21 → 28/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W. (PI), Xu, M. (CoI), Fow, K. L. (CoI) & Sun, Y. (CoI)
1/09/21 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
A Research on the Image of Scholars and University Spirit in Academic Novels
Xiao, C. (PI)
30/08/21 → 30/06/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research and Development of Incubator Noise Reduction and Photoelectric Sensor Technology
Wang, C. (PI)
3/08/21 → 17/02/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
National Guideline for the CRO Treatment and Prevention
Hubbard, R. (CoI) & Xia, J. (PI)
1/08/21 → 30/06/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
National consensus on treatment of Helicobacter pylori infection
Hubbard, R. (CoI) & Xia, J. (PI)
1/08/21 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
National Guideline for the Treatment and Prevention of the Clostridium Difficile Infection
Hubbard, R. (CoI) & Xia, J. (PI)
1/08/21 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
Wu, T. (PI)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
TED X UNNC
Shen, M. (PI)
1/07/21 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI)
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects