Search concepts
|
Selected filters
|
- 200 - 250 out of 612 results
- Export search results
Search results
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Graphene production via the mechanochemical cracking of single-mode microwave pyrolysed biomass
Pang, C. H. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Guideline Development of PCV Vaccine Implementation
Hubbard, R. (CoI) & Xia, J. (PI)
18/12/20 → 31/12/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Guidelines for GHD indications of growth hormone
Xia, J. (PI)
20/02/23 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Guidelines for medication for peripheral neuropathic pain in elderly individuals with organ dysfunction
Xia, J. (PI) & McDonald, S. (CoI)
1/07/24 → 31/12/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Guidelines for nutritional treatment of adult sepsis patients
Xia, J. (PI)
13/04/23 → 1/05/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Handling Uncertainties in Transportation and Logistics Using Granular Computing and Hyper-heuristics
Bai, R. (PI), Qu, R. (CoI), Anberree, T. (CoI), Burke, E. K. (CoI) & Bargiela, A. (CoI)
1/09/08 → 31/08/11
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Haze particle physicochemical properties in the Yangtze River Delta, Zhu River Delta
He, J. (PI)
1/07/16 → 30/06/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Healthcare Management Workshop Hubei
Chau, P. (PI)
8/12/20 → 30/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Healthcare Management Workshop Liaoning
Hubbard, R. (PI)
6/07/20 → 30/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Healthcare Management Workshop Zhejiang
Hubbard, R. (PI)
6/07/20 → 30/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High Humanistic Paradigm in Human Resource Management: Construct, Outcomes and Mecnisms
Fu, P. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
HKUST-SJTU Joint Research Collaboration Fund 2020
Ryu, S. (PI)
1/09/20 → 31/12/21
Project: Other Projects
-
How "3S" technologies benefit the Ocean economics
Hancock, C. (PI)
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
How can China win the global war for talent?
Lemanski, M. (PI)
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
How can UNNC further contribute to the internalization process of Ningbo city
Liu, C. (PI)
2/01/17 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
How children develop their abilities to automatically process Chinese characters: a behavioral and Event-Related Potential study
Jin, L. (PI)
1/07/17 → 26/07/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
How to attract more FDI to Ningbo under the One belt one road national strategy ()
Liu, C. (PI)
1/09/17 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
How to build the Meishan New Area under the One belt one road national strategy
Liu, C. (PI)
1/01/17 → 31/07/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Hydrodynamics and sediment transport in the swash zone
Zhu, F. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
IAMET Open fund to support PEMC PKL programme
Zhang, X. (PI)
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of Financial Inclusion on Systematic Risk
Hua, X. (PI)
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Impact of multiple dimensional principal stress rotations on soil behavior
Yang, Y. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impacts of Inequality on Social Cohesion and Individual Contribution to Public Funds
Lane, T. (PI)
1/10/20 → 31/07/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Improvement of Pilot Training Performance in the Context of Virtual Training Environment
Sun, X. (PI)
Project: Contract Projects › Horizontal-International Contract Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Indoor Air Pollution Control Technology
He, J. (PI)
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Indoor Localization Mapping with Sensor Fusion
Lee, B. G. (PI)
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Innovation Design Joint Lab
Sun, X. (PI)
1/01/17 → 31/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovation research on the teaching methods of ideological and political theory class in Sino Foreign University
Xu, M. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Integrating Ergonomics into the Design and Autonomous Driving System
Sun, X. (PI)
1/04/21 → 31/03/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
Feng, M. (PI)
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Intelligent Agents for Concept Invention of Design Forms
Reffat, R. (PI)
1/01/03 → 31/12/04
Project: Other Projects