Projects per year
- 1 - 50 out of 89 results
Search results
-
Finished
Research on Lighting Design for EU Market based on integration of Industry and Education
Liu, B. (PI)
15/11/23 → 6/11/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The First Yang Ming Cultural and Creative Design Competition
Wu, J. (PI)
16/10/23 → 31/05/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
Gill, A. (PI)
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
Yang, J. (PI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design and development of a Massage Chair
Sun, X. (PI)
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Intelligent Cockpit Concept Design
Sun, X. (PI)
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
UNNC x HoB Storage Design
Gill, A. (PI)
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
Ren, Y. (PI)
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020
Ren, Y. (PI)
1/12/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
Halim, D. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
Yi, X. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Physical simulation and active control of interface defects in drilling of CFRP/alloy laminated structure CFRP-
Liu, G. (PI)
1/11/20 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design and Development of High Precision Mini Home Use Instrumentation “
Sun, X. (PI)
20/10/20 → 20/10/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Yolanda Personal Care Appearance and Structure Design
Gill, A. (PI)
30/09/20 → 30/05/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
the Joint Research Centre in Advanced Materials Technology
Liu, X. (PI)
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Electrical Architectures Studies
Galea, M. (PI)
31/05/20 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Human-Computer multi-sensing data collection, analysis and design research
Sun, X. (PI)
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and test of high-speed induction motor drive system
Galea, M. (PI)
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Fire-Robot Design
Sun, X. (PI)
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
User’s Water Drinking Behavior and Related Product Design Research
Liu, B. (PI)
1/04/20 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
Ren, Y. (PI)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
Li, G. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
Chen, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
Yi, X. (PI)
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
Yang, X. (PI)
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
Solution for the information system of the building structure and its components
Lu, J. (PI)
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Planetary Mixer Design
Gill, A. (PI)
31/10/19 → 29/02/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ambient Temperature High Speed Electrical Drive System Development Technology Agreement
Galea, M. (PI)
1/09/19 → 30/04/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
Li, H. (PI)
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
Shi, Y. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
Chen, H. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
Yang, J. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
Yi, X. (PI)
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Bilateral Workshop on Fundamental Study and Applications of Micro/nano Scale Multiphase Thermal and Mass Transport
Ren, Y. (PI)
1/04/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Capital market database development
Lu, J. (PI)
1/03/19 → 31/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Application of PEI-Veil in flame-retardant and Toughened Composite Materials PEI-Veil
Liu, X. (PI)
14/02/19 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
On the hybrid machining mechanism and machined surface integrity of free-form aerospace surfaces via textured-grinding-wheel-based grinding and loose abrasive polishing
Li, H. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Numerical Eulerian-Lagrangian Computations of Coupled Gas-liquid-particle Three-phase Flows
Zhang, X. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Thermoplastic composite reinforced by continues fibres by fasting processing
Liu, X. (PI)
1/01/19 → 31/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Self-Powered Environment Sensing based on Novel Electret Materials and Flexible Energy-Generating Devices
Zhu, G. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
On the fabrication of textured optical glass surfaces by servo-vibration-assisted grinding with structured grinding wheels
Li, H. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on fluid-structure interaction effect in flow and release of microcapsules in deformable bifurcating microchannels with applications in drug delivery
Ren, Y. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Eco-friendly, high performance and multi-functional green building composites and its application technology
Yi, X. (PI)
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Cognitive Research on creating kids art product process
Shih, Y. T. (PI)
1/12/18 → 31/08/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects