Search concepts
|
Selected filters
|
- 150 - 200 out of 581 results
Search results
-
Human-Computer multi-sensing data collection, analysis and design research
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and test of high-speed induction motor drive system
Galea, M.
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Evaluation of Fire-Robot Design
1/05/20 → 1/12/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
User’s Water Drinking Behavior and Related Product Design Research
1/04/20 → 30/06/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Exploration of EBM Clinic Research on Acupuncture
Hubbard, R. & Zhang, Y.
1/04/20 → 31/12/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
A Study on the Latest Theory and Practice of Inclusive Finance
1/03/20 → 9/02/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A Study on the Theory and Practice of Inclusive Finance Reform in Ningbo from the Perspective of Modern Financial System
Liu, W.
1/03/20 → 9/02/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A Study on the Innovation of Credit Loan Model for Small and Micro Enterprises
1/03/20 → 9/02/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Empirical Analysis on Hospital Leadership
National Health Commission Capacity Building and Continuing Education Center
1/03/20 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
The Changing Landscape of Public Diplomacy: the case of China (provisional)
Zhang, X.
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Korean Culture Week - Korean Wave
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
The 9th Multidiscipliany International Scheduling Conference (MISTA)
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Besides the Screen: Tenth Anniversary
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Mobile Storytelling Congress
Xu, X.
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A.
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
A Study of Digital Innovation Mechanisms for Digital Start-ups Extension
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Job Creation and Destruction: Study on Mechanism and Empirics of the Effects of Digital Trade in China
Zhou, M.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Preparation of high voltage - high density capacitor from electrolytic tantalum powder
1/01/20 → 31/12/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Roads to integration: The role of Transport Infrastructure in the Domestic Market Integration in China
1/01/20 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Cultural diversity and team creativity: A moderated mediation model integrating informational benefits and social costs
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
The Galbraith Mechanism -Theory and Experiments
1/01/20 → 28/11/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and Development, Test and Industralization of New Smelting Techniques of Titanium ad Titaium Alloys
1/01/20 → 1/01/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study on countermeasures to further stimulate the vitality of microeconomic subjects and promote the high-quality development of private and small and medium-sized enterprises in Ningbo
1/01/20 → 30/11/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of International Clinical Practice Guide, Technical Specification and Service Standard for Acupuncture and moxibustion
Hubbard, R.
20/12/19 → 30/06/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on the role of enterprises in talent recruitment in during the period of “14th Five-Year Plan” “
13/12/19 → 30/03/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of Ningbo to Accelerate the Development of Service Trade
10/12/19 → 30/06/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The technological development of 1.5T cryogen-free low-temperature superconductive magnet1.5T
1/12/19 → 30/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Publish the paper:Team creativity/innovation in culturally diverse teams:A meta-analysis
26/11/19 → 15/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
Publish the paper:China’s “Great Migration”: The Impact ofthe Reduction in Trade Policy Uncertainty
Zhou, M.
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
Servo Actuator Thermal Analysis
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on control techniques of multi-phase fault-tolerant machines
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Mechanism of housing expropriation in Ningbo under the background of urban organic renewal
15/11/19 → 30/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Sustainable Development Goals in Journalism Reporting
15/11/19 → 14/11/22
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Design, Implementation and Evaluation of an Intelligent Dispatching Platform Based on IoT Logistics Technologies
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
File