Search concepts
|
Selected filters
|
- 500 - 550 out of 581 results
Search results
-
A Research on the Image of Scholars and University Spirit in Academic Novels
30/08/21 → 30/06/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Platform Application for Innovation China
1/09/21 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Collection narration in the cross media: a study based on the collection of Ningbo Bang Museum
1/09/21 → 28/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J., Lu, J., Zhou, T. & Deng, W.
9/09/21 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
UNNC x HoB Storage Design
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Comparison Study of Talent Strategy in Ningbo Leading Companies and International Bench-marking Companies
Feng, X. & Wang, L.
28/10/21 → 27/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on application scenarios of Ningbo sci-tech innovation digital reform
30/11/21 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Future Community, Future City
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
An investigation into the influencing mechanism of IT-enabled multi-tier supply chain visibility on supply chain resilience
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Vibration power flow and performance evaluation of jointed structures with non-smooth interfaces
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Examining the pathways and mechanisms of digital servitization in Zhejiang manufacturing firms
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The stochastic epidemic model driven by α-stable process and its application
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Study on the Chinese Innovation Eco-system: From the Perspective of Multi-stage and Multi-dimensional Infrastructure
Liu, M., Tan, K. C., LUO, J., Chan, H. K. & YUAN, R.
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Solid electrolyte interphase characteristics and long cycle stability mechanism of lithium metal batteries
1/01/22 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Intelligent Cockpit Concept Design
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Technology and Culture Symposium
Mangi, E., Botti, G., Chen, W. & Shinohara, H.
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
Researching the participation of universities and colleges in the education of the elderly.
18/05/22 → 18/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design and development of a Massage Chair
1/07/22 → 1/12/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z., Deng, W. & Zhou, T.
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Dongqian Lake 2022
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D., Mareta, S., Ran, L., Xu, J., Huang, L. & Lin, T.
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W., Zhou, T., Zhang, Z. & Xie, J.
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Yinzhou district 2023
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J., Lu, J., Deng, W. & Zhou, T.
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Alzheimer's Disease Care Respite Technology
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
File -
Research on Bi-objective and Multi-scenario Collaborative Scheduling Methods Considering Carbon Emissions
1/01/23 → 31/12/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Shaping the Connected Museum-Mixed Reality Museum
Ch'ng, E.
1/02/23 → 1/02/24
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Guidelines for GHD indications of growth hormone
20/02/23 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Ningbo Key Laboratory of Digital Port Technologies
Bai, R., Chong, A., Ren, J. & Dong, N.
8/03/23 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Expert Consensus on the Treatment of Rheumatoid Arthritis with Tripterygium Wilfordii
20/03/23 → 31/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on digital twin based key technologies for multi-AGV scheduling and cooperation in complex systems
Bai, R., Ren, J., Yao, Y. & Ullah, F.
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Guidelines for nutritional treatment of adult sepsis patients
13/04/23 → 1/05/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province