Search concepts
|
Selected filters
|
- 300 - 350 out of 579 results
Search results
-
Research on key issues of two-axis compensated air-core compulsators with high delivered energy density
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
First Principles Derived Equation of States for Carbon Dioxide Capture and Transport
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
EU grant-dragon star Plus-Odette Paramor
Paramor, O.
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Investigation of micro-plastics in the Chinese urban river catchment: the case of Ningbo
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Enhancement of Molten Salt Electro-Deoxidation Process for Titanium Alloys Production via the Application of Metal Co-Oxide Cathodes
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M.
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Control strategies of an Electro-mechanical braking system for automotives
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Collaborative Consumption in Hospitality and Tourism in China: From Customer Engagement Perspective
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on high temperature thermal state performance and refractory liner corrosion characteristics of impinging stream entrained-flow gasifier
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Study of PMSM Control Strategy with Improved Phase Current Reconstruction Method
Yan, H.
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on torque ripple and common-mode voltage eliminations for multi-phase propulsion converters
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A.
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
On the fabrication of textured optical glass surfaces by servo-vibration-assisted grinding with structured grinding wheels
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Content service for the construction of medical question answering system knowledge base
16/01/19 → 15/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Retention and recruitment of migrant nurses post-Brexit
Spiliopoulos, J.
21/01/19 → 31/07/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Application of PEI-Veil in flame-retardant and Toughened Composite Materials PEI-Veil
14/02/19 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Investigation on talents in Yinzhou District's industrial foundation
27/02/19 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Capital market database development
Lu, J.
1/03/19 → 31/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Capacity building for developing standardized and computerized speech and language assessment tools in China
Jin, L.
1/03/19 → 28/02/21
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Intelligent Supply Chain Collaborative Research Project
19/03/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Nottingham Research Leaders Programme (NRLP) 2019_Minghai Zhou
Zhou, M.
1/04/19 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Nottingham Research Leaders Programme (NRLP) 2019_Shixin Zhang
1/04/19 → 1/03/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Bilateral Workshop on Fundamental Study and Applications of Micro/nano Scale Multiphase Thermal and Mass Transport
1/04/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design and Development of Order Pick-up and Drop-down Priority Strategy for Cyber-Physical Logistic System
10/04/19 → 31/07/20
Project: Contract Projects › Horizontal-International Contract Projects
-
Create a credit scoring model for small and micro enterprises, based on financial inclusion credit information platform
12/04/19 → 11/04/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Optimization of supply chain financial system based on blockchain technology
12/04/19 → 11/04/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Intellectual Property and Patent Assessment to Promote the Financing of Small and Medium-sized Enterprises
12/04/19 → 11/04/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research and Application of Reliable Financial Service Platform Based on Blockchain E-Invoice
1/05/19 → 30/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Mobile phone acquisition data crawling and data structure system
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Key technological enhancement and applications for Ningbo port Terminal operating system
30/06/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Resource Recycling Technology Research and Demonstration for Retired Power Batteries
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi-fuel, high reliable solid oxide fuel cell stack technology
Konysheva, E.
1/07/19 → 1/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D.
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo specific passive house technical guidance
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
the Impact of Health Risk Knowledge Assessment of Air Pollution on Acute Upper Respiratory Diseases:2-Year Population-Based longitudinal Study
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Risk Prevention and Supervision Innovation of Informal Financial Institutions under the Background of Fintech
12/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Applied research of financial service based on enterprise credit and intellectual property valuation integration technology
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
有机固废的高效清洁能源化转化技术
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects