Projects per year
- 1 - 50 out of 317 results
Search results
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
1/04/21 → 1/04/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J., Lu, J., Deng, W. & Zhou, T.
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Intelligent Cockpit Concept Design
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Hefeng Creative Lab Phase II
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
R&D on Solid Waste Green Processing Technology and Equipment-harmless and resource disposal technology and equipment for pharmaceutical sludge based on microwave pyrolysis - catalytic reforming
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Smart AI for Firefighters Safety Assessment
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W., Zhou, T., Zhang, Z. & Xie, J.
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
City Tour-Yinzhou district 2023
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J., Lu, J., Zhou, T. & Deng, W.
9/09/21 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Application and Implementation of AI Algorithm in HVAC
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Technology and Culture Symposium
Mangi, E., Botti, G., Chen, W. & Shinohara, H.
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
Indoor Localization Mapping with Sensor Fusion
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Other Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M.
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
the Joint Research Centre in Advanced Materials Technology
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z., Deng, W. & Zhou, T.
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. & Yousef, W.
2/12/20 → 2/06/23
Project: Other Projects
-
Architecture prototyping based energy retrofit for office buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Embedded Wearable Sensors for Firefighter Safety Assessment and Applications
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
3D Digitalization for the Historic Site of Zhejiang Custom House in Ningbo
22/06/21 → 10/03/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Fabrication and catalytic performance study of catalytic nickel oxide nanomaterials
1/02/21 → 28/02/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research and Development of Incubator Noise Reduction and Photoelectric Sensor Technology
3/08/21 → 17/02/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
PDMxFT: Product Design and Manufacture x Furry Tail
22/09/22 → 1/02/23
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Reconstructing the origin and spread of Asian rice based on Geographic Information System and Bayesian modelling
1/02/21 → 31/01/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research and Development, Test and Industralization of New Smelting Techniques of Titanium ad Titaium Alloys
1/01/20 → 1/01/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Impact of multiple dimensional principal stress rotations on soil behavior
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on regression testing by multi-information dynamic extraction, fusion, and correlation
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hybrid machining of fir tree blade root structures by coupling textured-grinding wheel-based grinding and loose abrasive polishing
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Preparation of high voltage - high density capacitor from electrolytic tantalum powder
1/01/20 → 31/12/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Novel polymeric acceptors: synthesis, film morphology and all polyer solar cells
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A.
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Self-Powered Environment Sensing based on Novel Electret Materials and Flexible Energy-Generating Devices
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects