Projects per year
- 250 - 300 out of 317 results
Search results
-
Research on active structural vibration control using a compliant actuation mechanism with the passive vibration energy absorption property
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Technical development of thermoplastic composites
30/03/18 → 30/09/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Study on the Reaction Mechanism of Copper-catalyzed Carbon Dioxide Reduction to Small Molecule Fuel by Density Functional Theory (DFT) and the Design of New Catalytic System
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
New ultra-high-speed 4D nanometer doping detection, drawing and prototyping, manufacturing: FIB-SEM combination process
Chee, K.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of Water Quality in Ningbo In Relation To Land-cover Type
Griffiths, J.
Ningbo Science and Technology Bureau
1/09/14 → 22/07/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C.
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Logistics Service Network Optimisation and Multi-mode Intelligent Container Operations Scheduling
1/06/15 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on development guideline of China's new smart city, based on digital technologies
Tang, L.
3/01/18 → 30/05/18
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Key Technologies Research of Hybrid Power Generation System for Advanced Marine Ship Application
1/04/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Nano fluids of low-dimensional carbon nanomaterials and synthetic organic heat transfer oil
Peng, C.
1/03/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The research of new 3D HDR multi-focused images fusion technologies and application in digital microscope
2/03/15 → 1/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Policy and Mechanism Study for Activating and Utilizing the Abandoned Rural House on Taogong Island, Dongqian Lake
Cheshmehzangi, A.
27/02/17 → 26/02/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A.
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Electrochemical Production of Titanium Alloy Powders for 3D Printing
Zhejiang University of Science and Technology
18/01/16 → 17/01/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. & Ramadan, A.
1/01/16 → 1/01/18
Project: Other Projects
-
Stress state variation and shakedown analysis of trackbed under repeated moving train loads
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Problem of Information in Dynamic Games
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D of Novel thermoplastic composite
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
IR spectroscopic investigations into pyridine based catalysts for the photochemical reduction of CO2
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The development and application of recycled polymeric composites for marine applications
1/12/14 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Interaction Design for Information Encounter In the Context of Research Work
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
AC/DC electric loading simulator for more electric aircraft
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of high-efficiency and low-pollution anti-corrosion coatings for steel pipeline
21/12/15 → 21/12/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L.
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.07.01.2015.06.001-Jun He-佛山市南海区商盈化工有限公司
Shang-ying Chemical Industry Co, Ltd, Nanhai District, Foshan City
15/11/15 → 14/11/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The development of high-power starter generator and its controller
1/09/16 → 31/10/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research and Development of Narrow Band Tunable Laser
Zhang, Y.
Zhejiang Jiayuan Photonic technology Co., Ltd
15/10/14 → 14/10/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Measurement Uncertainties on Efficiency Test of High-Efficiency Induction Machine
1/10/16 → 30/09/17
Project: Contract Projects › Horizontal-International Contract Projects
-
Low -cost Indoor Mobile Mapping for BIM Application
Hancock, C.
8/05/17 → 31/08/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Characteristics and source apportionment of urban haze in Hangzhou-Ningbo region
Zhejiang University of Science and Technology
1/06/15 → 31/05/17
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Development of multifunctional low-pollution waterborne coatings
Ningbo Science and Technology Bureau
23/05/14 → 22/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of low emission waterborne coatings with multi-functional characteristics
1/05/14 → 22/05/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
New analytical method for one-step simultaneous measurement of multiple organic aerosol tracers
National Natural Science Foundation of China (NSFC)
1/01/14 → 31/12/16
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Arc Fault Detection for grid-connected PV generation Systems
North China Electric Power University
1/01/15 → 31/12/16
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Mathematical Modeling and Algorithm of Real-time Passenger Flow based Smart Bus Scheduling
29/02/16 → 31/07/16
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Quantifying the impacts and risk of Typhoon related flooding in Ningbo
1/07/14 → 30/06/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the influence of steel fiber and polyvinyl alcohol fiber concrete on the performance of bridge and bridge end transition slab
Ningbo Science and Technology Bureau
30/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Semiconductor Nanodevice Characterisation and Fabrication and Rapid Prototyping Using Novel Combined SEM/FIB Techniques
Chee, K.
Ningbo Science and Technology Bureau
1/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Interaction Design for Information Encounter in the Context of Research Work
Ningbo Science and Technology Bureau
1/06/15 → 30/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.002-Key technologies research of traction mo
Ningbo Science and Technology Bureau/Finance Bureau
24/05/14 → 23/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R.
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
From Big Data to New Knowledge: Fundamental Technology Research with an Application to Intelligent Logistics Services Platform Development
Qiu, G. & Bai, R.
1/01/12 → 7/01/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
1/01/14 → 1/01/16
Project: Other Projects
-
The application of LIDAR in slope deformation study
De Ligt, H.
14/05/15 → 31/12/15
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ningbo Key Lab on Clean Energy Conversion Technologies
1/09/13 → 31/08/15
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Numerical Eulerian-Lagrangian Simulations of Fully Coupled Gas-liquid-particle Three-phase Flows
Ningbo Science and Technology Bureau
1/06/13 → 31/05/15
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Energy Efficient Freight Transport Scheduling in Supply Chain Logistics
Bai, R. & Qu, R.
1/04/13 → 31/03/15
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Developing a Computational Tool for a Sustainable Assessment of Intelligent Buildings in Saudi Arabia
Reffat, R., Abdou, A. & Budaui, I.
1/02/12 → 1/02/14
Project: Other Projects
-
Optimisation of Large Scale Freight Transportation Service Network Design and Fleet Scheduling
Bai, R., Kendall, G., Qu, R. & Farjudian, A.
1/01/11 → 31/12/13
Project: Government Funded Projects › Vertical-National Government Funded Projects