Search concepts
|
Selected filters
|
- 350 - 400 out of 581 results
Search results
-
Early-stage Breast Cancer Evidence Evaluation
Hubbard, R. & Xia, J.
1/09/20 → 30/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
TED X UNNC
Shen, M.
1/07/21 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on key issues of two-axis compensated air-core compulsators with high delivered energy density
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hydrodynamics and sediment transport in the swash zone
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
A study on the overall mechanism of leadership traits to organizational paradox in Strategic Entrepreneurship: emergence, response and dynamic evolution
1/10/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Control strategies of an Electro-mechanical braking system for automotives
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
On the fabrication of textured optical glass surfaces by servo-vibration-assisted grinding with structured grinding wheels
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
CEE Key discpline fund_Chemical engineering and technology
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Human-Computer multi-sensing data collection, analysis and design research
20/05/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Temperature-sensitive electrolytes with reversible self-protection mechanism for lithium-ion battery
Xia, L.
1/01/19 → 30/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
"Construction of Performance Framework in Sino Foreign University: A Case Study of UNNC "
1/12/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The Strategy and Performance of Governmental Venture Capitalists: From the Perspective of Cross-level Conflicting/Compatible Logics
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Collaborative Consumption in Hospitality and Tourism in China: From Customer Engagement Perspective
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
High Humanistic Paradigm in Human Resource Management: Construct, Outcomes and Mecnisms
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research Workshop on Digital Innovation and New Venture Extention
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
An Alternative Pathway for the Sustainable Development: The development of Campus-based Sustainability Assessment Tool (CSAT) for Chinese Cities
Dawodu, A.
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
First Principles Derived Equation of States for Carbon Dioxide Capture and Transport
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Application of PEI-Veil in flame-retardant and Toughened Composite Materials PEI-Veil
14/02/19 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Research on torque ripple and common-mode voltage eliminations for multi-phase propulsion converters
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Catalytic Cracking Technology for Tar Removal from Waste Pyrolysis Gas
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on an integrated technology of reclaiming drilling sludge and slag in highway construction
7/06/18 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Norms of Science with the "Chinese Characteristics": Evolution, Dynamics and Implications
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
"Investigation on gas-liquid-solid three phase flow coupled with meso-scale particle-bubble interactions, particle-liquid turbulence and bubble induced turbulence in bubble column reactors"
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Relationship of Uncertainty and Business Cycles in China
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Galbraith Mechanism -Theory and Experiments
1/01/20 → 28/11/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study of PMSM Control Strategy with Improved Phase Current Reconstruction Method
Yan, H.
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Addressing the Incentives Toward Modern Slavery through the Right to Just and Favourable Conditions of Work
Birchall, D.
1/01/21 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Research on high temperature thermal state performance and refractory liner corrosion characteristics of impinging stream entrained-flow gasifier
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Numerical simulation and experimental study of flash boiling spray characteristic of direct injection gasoline engine
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Servo Actuator Thermal Analysis
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
IAMET Open fund to support PEMC PKL programme
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
The Enhancement of Molten Salt Electro-Deoxidation Process for Titanium Alloys Production via the Application of Metal Co-Oxide Cathodes
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on fluid-structure interaction effect in flow and release of microcapsules in deformable bifurcating microchannels with applications in drug delivery
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
ACC TECH and NOTTINGHAM UNIVERSITY JOINT LABORATORY in SUSTAINABLE COMPOSITES MATERIALS
1/01/17 → 1/01/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Collection narration in the cross media: a study based on the collection of Ningbo Bang Museum
1/09/21 → 28/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Future Community, Future City
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
UNNC x HoB Storage Design
1/10/21 → 31/01/22
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
BMJ Rapid recommendation for endocrine therapy after breast cancer surgery
Hubbard, R.
12/10/20 → 28/02/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development and test of high-speed induction motor drive system
Galea, M.
15/05/20 → 31/03/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A.
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects