Search concepts
|
Selected filters
|
- 100 - 150 out of 578 results
Search results
-
The Development of New Magnetic Resonance Imaging Technology
1/08/16 → 31/07/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Reform of the teaching methods of Ideological and political theory course in Sino-foreign cooperative university
1/09/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study of Financial Products and Consumer Segmentation
1/09/16 → 31/08/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The development of high-power starter generator and its controller
1/09/16 → 31/10/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The key and strategies of improving Meishan new area's international competitiveness
15/09/16 → 31/10/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A Study on the Ningbo Urbanization Zone Development under the Growth Pole Theory
20/09/16 → 31/03/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Measurement Uncertainties on Efficiency Test of High-Efficiency Induction Machine
1/10/16 → 30/09/17
Project: Contract Projects › Horizontal-International Contract Projects
-
Research on active structural vibration control using a compliant actuation mechanism with the passive vibration energy absorption property
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi - objective optimization theory and method for waste recycling of electronic products
Gu, F.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design of non-carbonate based electrolyte solution and investigation of the formation mechanism of interfacial surface film on the lithium-rich manganese-based cathode for Lithium-ion batteries
Xia, L.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on multi-physics field of high speed high power density electrical machine used for electrical propulsion
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Probing the excited state photochemistry of key reduced intermediates in photochemical CO2 reduction
Summers, P.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the Reaction Mechanism of Copper-catalyzed Carbon Dioxide Reduction to Small Molecule Fuel by Density Functional Theory (DFT) and the Design of New Catalytic System
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
New ultra-high-speed 4D nanometer doping detection, drawing and prototyping, manufacturing: FIB-SEM combination process
Chee, K.
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on optimal allocation of investment and consumption in incomplete market
Zhang, Y.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Arc fault detection and location for DC distribution systems
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The Study of the Development of Green Finance System in Ningbo
17/10/16 → 31/08/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
GF/CF composite recyling and reuse
30/11/16 → 30/11/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the innovation and entrepreneurship ecosystem and policy support system in Ningbo
Hofman, P.
1/12/16 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Transnational Comparative study of innovation and entrepreneurship policy support system
Hofman, P.
1/12/16 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The future of Humanitarian Intervention
1/12/16 → 31/12/17
Project: Contract Projects › Horizontal-International Contract Projects
-
Free Discontinuity Problems and Applications in Fracture Mechanics
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
An investigation of composite aircraft fire protection
1/01/17 → 31/12/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Graphene production via the mechanochemical cracking of single-mode microwave pyrolysed biomass
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Present situation and policy suggestion of developing quantitative trading industry in Ningbo
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigations of power flow characteristics of nonlinear vibration isolation systems
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Indoor Air Pollution Control Technology
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Four-dimensional Dopant Profiling for Rapid Prototyping and Fabrication of Nanoscale Semiconductor Devices Using Novel Combined SEM / FIB Techniques
Chee, K.
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D of Novel thermoplastic composite
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
The Growth of Digital Venture: A Study on the Effect of Scaling-up Mechanisms and Digital Innovation
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Development of a new and robust hybrid data processing algorithm for a low-cost integrated sensor indoor positioning system
Lau, L.
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Freight service network design optimisation and its applications
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovation Design Joint Lab
1/01/17 → 31/12/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Solar-thermochromism of Ionic Liquid-Transition Metal Complexes Based Films and Their Application in Smart Windows
Yu, L.
Zhejiang University of Science and Technology
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Problem of Information in Dynamic Games
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Char formation, high temperature dielectric property and its enhancement on char surface reaction in microwave pyrolysis of biomass
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Organic laser array based explosive sensor
Chen, F.
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The evolution of British social integration policy and Its Enlightenment to China
Appleton, S.
1/01/17 → 30/04/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The Research on the Leverage Effect of Fiscal Policies on Promoting the Development of Capital Market in Ningbo
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Exploring green supply chain management: strategy-structure-capability-performance perspective
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
NSFC Grant - Free discontinuity problems and applications in fracture mechanics
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Next Generation Medical Devices using Antimicrobial Phosphate Based Glasses and Glass Fibres.
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
ACC TECH and NOTTINGHAM UNIVERSITY JOINT LABORATORY in SUSTAINABLE COMPOSITES MATERIALS
1/01/17 → 1/01/22
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
How to build the Meishan New Area under the One belt one road national strategy
1/01/17 → 31/07/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
AC/DC electric loading simulator for more electric aircraft
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Taylor reactor micro-fine particle liquid-solid two-phase flow transport behavior modulation
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
IR spectroscopic investigations into pyridine based catalysts for the photochemical reduction of CO2
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Ningbo City International Branding Research
2/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects