Projects per year
Search results
-
Active
Targeting urban flood resilience with Nature-Based Solutions
Chan, F. (PI)
1/01/24 → 31/12/26
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
Feng, M. (PI)
1/12/23 → 10/05/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Finished
Reconstructing the origin and spread of Asian rice based on Geographic Information System and Bayesian modelling
Long, T. (PI)
1/02/21 → 31/01/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
International Conference on Resource Sustainability – “Sustainable Urbanisation” in the BRI Era
Chan, F. (PI)
31/08/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Integrating science and monitoring to predict emerging risks for water pollution and river ecosystem health
Feng, M. (PI)
6/02/20 → 31/07/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
Fu, P. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental flows study for small green hydropower plants: integrated hydro-thermal regimes analysis
Feng, M. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
Chan, F. (PI)
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
EU grant-dragon star Plus-Odette Paramor
Paramor, O. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Investigation of micro-plastics in the Chinese urban river catchment: the case of Ningbo
Chan, F. (PI)
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
EU-China Innovation Platform on Sustainable Urbanisation (URBAN-EU-CHINA)
Paramor, O. (PI)
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Modeling the paleo Haizishan ice cap in the southeastern Tibetan Plateau
Fu, P. (PI)
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
European Research and Innovation Centre of Excellence in China (ERICENA)
Paramor, O. (PI)
1/01/16 → 31/12/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Investigation of Water Quality in Ningbo In Relation To Land-cover Type
Griffiths, J. (PI)
Ningbo Science and Technology Bureau
1/09/14 → 22/07/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Quantifying the impacts and risk of Typhoon related flooding in Ningbo
Chan, F. (PI)
1/07/14 → 30/06/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects