Projects per year
Search results
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of A Rotatable Cryogen-free Superconductive MRI System
Wang, C. (PI), Wang, J. (CoI), Bai, S. (CoI), Huang, L. (CoI), Liu, B. (CoI) & Yao, R. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Construction of coastal wetland remote sensing image data set in Hangzhou Bay area Ningbo
Feng, M. (PI)
1/12/23 → 20/02/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Alzheimer's Disease Care Respite Technology
Sun, X. (PI)
1/01/23 → 1/01/25
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
File -
The stochastic epidemic model driven by α-stable process and its application
Cai, Y. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI), Li, B. (CoI) & Kow, K. W. (CoI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Model and Data Driven Hyper-Heuristics for Combinatorial Optimization and Their Applications in Port Operation Integrated Scheduling
Bai, R. (PI)
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
Wang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Energy flow tailoring and vibration suppression of laminated cylindrical shells with attached absorbers
Yang, J. (PI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Zhejiang - Canada Joint Laboratory on Green Chemicals and Energy
Wu, T. (PI)
16/12/22 → 16/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research on Lighting Design for EU Market based on integration of Industry and Education
Liu, B. (PI)
15/11/23 → 6/11/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Evaluation of Chinese Pilot Training Performance in the Intelligent Communication Analysis System
Sun, X. (PI)
1/04/23 → 31/10/24
Project: Contract Projects › Horizontal-International Contract Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
Wu, T. (PI)
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
Yang, J. (PI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI)
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J. (PI), Lu, J. (PI), Zhou, T. (PI) & Deng, W. (PI)
9/09/21 → 24/06/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
86 model Windows System
Mangi, E. (PI)
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The First Yang Ming Cultural and Creative Design Competition
Wu, J. (PI)
16/10/23 → 31/05/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J. (PI), Lu, J. (CoI), Deng, W. (PI) & Zhou, T. (PI)
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Intelligent Cockpit Concept Design
Sun, X. (PI)
1/02/22 → 1/02/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
Wang, J. (PI)
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Smart AI for Firefighters Safety Assessment
Lee, B. G. (PI)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Hefeng Creative Lab Phase II
Sun, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
Fu, P. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
R&D on Solid Waste Green Processing Technology and Equipment-harmless and resource disposal technology and equipment for pharmaceutical sludge based on microwave pyrolysis - catalytic reforming
Wu, T. (PI), Xu, M. (CoI) & Luo, X. (CoI)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Temporal and spatial based coupled fluid dynamics and tribology multi-scale mechanism and modelling for optimised cutting fluid application
Axinte, D. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Design and Analyses of Control Strategy for High Speed PMSM
Zhang, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
Zhang, Z. (PI)
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
Yi, X. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
Halim, D. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of Muc-001 as an innovative drug targeting tumor stem cells
Tang, B. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Application and Implementation of AI Algorithm in HVAC
Zhang, Z. (PI)
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Technology and Culture Symposium
Mangi, E. (PI), Botti, G. (CoPI), Chen, W. (CoI) & Shinohara, H. (CoPI)
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M. (PI)
1/10/18 → 30/09/23
Project: Other Projects
-
Indoor Localization Mapping with Sensor Fusion
Lee, B. G. (PI)
1/02/21 → 30/09/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M. (PI)
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
the Joint Research Centre in Advanced Materials Technology
Liu, X. (PI)
13/08/20 → 12/08/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on Embedded Wearable Sensors for Firefighter Safety Assessment and Applications
Lee, B. G. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Architecture prototyping based energy retrofit for office buildings
Deng, W. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects