Search concepts
|
Selected filters
|
- 300 - 350 out of 581 results
Search results
-
Finished
2018 International Conference in Information Resources Management
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Ningbo InsuranceTechnology Industry Development Report
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The design and controllable synthesis of coal-fired flue gas Hg0 and SOx transfer catalyst and its mechanism study
Zhao, H., Xu, M. & Yang, G.
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Qualitative Spatial Logics for Validating Matches between Spatial Objects
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Decision support system for smart healthcare services
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Chinese Economists Society President's Forum: New Challenges for Public Policy and Management
1/01/18 → 30/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Basic research of ironless core two axis compensated compulsators;
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
An investigation into predictive modelling of the impact of air pollution on China’s disease burden
Yang, J.
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Design Optimization of Dual-Active-Bridge Power Converters for Energy Recovery Applications
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
"Investigation on gas-liquid-solid three phase flow coupled with meso-scale particle-bubble interactions, particle-liquid turbulence and bubble induced turbulence in bubble column reactors"
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Norms of Science with the "Chinese Characteristics": Evolution, Dynamics and Implications
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improve the Ductility of NdFeB materials
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The Relationship of Uncertainty and Business Cycles in China
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
CEE Key discpline fund_Chemical engineering and technology
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
soil properties under double non-coaxiality and principal stress rotation
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
A wearable medical sensor design with an integrated ultra-low power DSP ASIC for motion recognition and position tracking
Ni, W.
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hydrodynamics and sediment transport in the swash zone
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The “Invisible-Touch” approach: Toward an integrative (Theoretical and practical) System of Strategic Transformation via the "Reverse M&A" by Chinese firms “
Li, P. P.
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Catalytic Cracking Technology for Tar Removal from Waste Pyrolysis Gas
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Numerical simulation and experimental study of flash boiling spray characteristic of direct injection gasoline engine
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Development of High-end Metal Titanium Low Energy Consumption Preparation Process
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The key studies of Satellite-difference RTK PPP applied in huge bridge deformation
Tang, X.
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Environmental technology innovation for greening supply Chains
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
How can China win the global war for talent?
Lemanski, M.
1/01/18 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A study on the deepening of the reform of the commercial registration system in Ningbo
Ge, J.
14/12/17 → 13/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on further optimization of enterprise financing environment in Ningbo
Zhou, J.
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of building the international talent community in Ningbo
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on how to extend the healthcare international collaboration through the University of Nottingham Ningbo China
Hsieh, C.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the current situation of International quality Educational Resources in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo’s internationalization strategy and its role in the Belt Road Initiative
Tan, P. M.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on the Prospect of " 16+1 " Trade and Economic Cooperation Demonstration Zone in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Approaches to improve urban eco-environment quality in Ningbo
1/12/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Coating on metal for marine anticorrosion application
1/12/17 → 30/11/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Practices and Strategies of Cultural Industry in Ningbo towards the Matching of Capital Market
1/12/17 → 31/08/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Two-way flow of capital and 2025 China manufacturing
Zhang, Y.
1/11/17 → 15/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Unified Information System Based Supply Chain Integration and Optimisation for Intermodal Transportation: A Study on Ningbo Port
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Key Technology of Bridge Deformation Monitoring Based on Multi-Frequency BDS / GPS
Hancock, C.
1/10/17 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Cultural heritage and cross-border communication studies along the land/maritime silk road in the digital age: Construction of an open and VR-available cloud-based heritage database with social function
Ch'ng, E.
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Speed Up the Establishment of Ningbo International Chamber of Commerce New Business Models Referring to British Chamber of Commerce Business Model
1/10/17 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Robust Data Mining Technologies and Their Applications in Cold Chain Logistics Big Data Analytics
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Advanced Laser Project
1/09/17 → 31/08/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
How to attract more FDI to Ningbo under the One belt one road national strategy ()
1/09/17 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Precursors synthesis process and stintering process optimization
1/08/17 → 30/09/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development and project demonstration of large-scale coal water slurry gasification
1/07/17 → 30/04/21
Project: Government Funded Projects › Vertical-National Government Funded Projects