Search concepts
|
Selected filters
|
- 350 - 400 out of 620 results
- Export search results
Search results
-
Finished
A New Generation of Super Performance E-Drives for Transport Electrification
Galea, M. (PI)
1/10/18 → 30/09/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Zizhu Audio-Visual Research Center Research Grants
Ryu, S. (PI)
1/10/18 → 30/04/20
Project: Other Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
An investigation on the influence of the manufacturing techniques on the mechanical properties of glass fibre reinforced polymer composites
Lu, J. (PI)
1/10/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Employment and distribution effects of artificial intelligence technology applications
Zhou, M. (PI)
1/10/18 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
The Green Synthesis of Fit-for-purpose Catalysts for the Pyrolytic Conversion of Municipal Solid Wastes (MSW) using Unwanted Power Station Ash
Pang, C. H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Key Technology and Application demonstration of HPP Natural Fruit and vegetable Juice processing HPP
Sun, Y. (PI)
30/09/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Design and Development of Replenishment Strategy Module for Smart Robotic Warehouse System
Chan, H. K. (PI)
1/09/18 → 31/07/20
Project: Contract Projects › Horizontal-International Contract Projects
-
The influence of trade barrier on the performance and innovation ability of Chinese enterprises
Hua, X. (PI)
1/09/18 → 9/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
The effects of interdiffusion between TBCs and single crystal superalloys on the mechanical characteristics
Chen, H. (PI)
1/09/18 → 31/12/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Fifth International Conference on Offshore Energy and Storage
Galea, M. (PI)
1/09/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
Song, H. (PI)
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Reflections and suggestions on the reform of local financial regulatory system in China – using Ningbo as an example
Hua, X. (PI)
1/09/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
光固化树脂脱附处理技术研发
Zhu, G. (PI)
Ningbo Shisheng Technology Co., Ltd
17/08/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
UoN Cascade project Bamboo & Digital Fabrications Techniques - lead Hiroyuke Shinohara
Shinohara, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Geometrical and material measurement and analysis of a provided sawing blade and new blade development
Li, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Resources for Interculturality in Chinese Higher Education/ RICH-Ed
Du, P. (PI)
1/08/18 → 14/04/21
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Tourism Cooperation Between Ningbo and Middle & Eastern European Countries Under the Belt and Road Context
Liu, C. (PI)
1/08/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Innovation research on the teaching methods of ideological and political theory class in Sino Foreign University
Xu, M. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
Research and Development of Upper limb Motion capture system based on flexible stretch Sensing Technology
Zhu, G. (PI)
1/07/18 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Sustainable Economic Development – Zhejiang-UK (Nottinghamshire) Health Industry Network Initiative
Hubbard, R. (PI)
1/07/18 → 11/11/18
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on an integrated technology of reclaiming drilling sludge and slag in highway construction
Wang, J. (PI)
7/06/18 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Workshop on humanitarian intervention, counterfactual history, and resilience: cross-disciplinary spaces and public policy solutions
Dawson, G. (PI)
6/06/18 → 1/07/19
Project: Contract Projects › Horizontal-International Contract Projects
-
A Study on the organic renewal policy system of Ningbi City
Liu, C. (PI)
1/06/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
A Study on the Significance of Teaching Setting of Ideological and Political Courses in Sino-Foreign Universities from the Perspective Of "Glocal" -- Using University Of Nottingham Ningbo China as an Example
Cheng, M. L. (PI)
1/06/18 → 30/06/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
A Study on Freshmen Adaptation in Sino-Foreign Universities
Zhou, M. (PI)
1/06/18 → 30/06/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
CIBSE support fund
Xia, L. (PI)
31/05/18 → 31/05/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Impact of Financial Inclusion on Systematic Risk
Hua, X. (PI)
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
International Comparative Study on Chinese and British Characteristic Towns to Promote Advanced Manufacturing Industry
Hua, X. (PI)
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Comparative Study on the Development of Digital Financial Inclusion
Hua, X. (PI)
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Calculation and analysis of soil displacement caused by stopping of tunnel shield machine
Yang, Y. (PI)
11/05/18 → 10/05/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Study on the Countermeasures of strengthening the Cooperation of "Belt and Road" International Science and Technology Innovation in Ningbo "
Liu, C. (PI)
1/05/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Thermochromic window Filim curing project
Yu, L. (PI)
1/04/18 → 30/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Technical development of thermoplastic composites
Liu, X. (PI)
30/03/18 → 30/09/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Power Tools Design
Shih, Y. T. (PI)
1/03/18 → 30/09/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on development guideline of China's new smart city, based on digital technologies
Tang, L. (PI)
3/01/18 → 30/05/18
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
Chen, H. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
Xu, M. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Improve the Ductility of NdFeB materials
Chen, H. (PI)
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
CEE Key discpline fund_Chemical engineering and technology
Hall, P. (PI)
Ningbo Municipal Finance Bureau
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Decision support system for smart healthcare services
Bai, R. (PI)
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
High Humanistic Paradigm in Human Resource Management: Construct, Outcomes and Mecnisms
Fu, P. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
Li, B. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The design and controllable synthesis of coal-fired flue gas Hg0 and SOx transfer catalyst and its mechanism study
Zhao, H. (PI), Xu, M. (CoI) & Yang, G. (CoI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Hydrodynamics and sediment transport in the swash zone
Zhu, F. (PI)
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects