Projects per year
Search results
-
Finished
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Development of Incubator Noise Reduction and Photoelectric Sensor Technology
Wang, C. (PI)
3/08/21 → 17/02/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
IAMET Open fund to support PEMC PKL programme
Zhang, X. (PI)
4/02/21 → 31/12/21
Project: University Funded Projects › Internal-Research Matching Grant Project for Successful External Grant
-
Design and Analyses of Control Strategy for High Speed PMSM
Zhang, X. (PI)
1/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Multi-phase Motor Drive Technology for Multil-wing Drone
Li, J. (PI)
7/12/20 → 30/06/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Frequency response analysis of a modular multilevel power converter for multi-terminal HVDC applications
Xu, J. (PI)
1/12/20 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Workshop on Green Airports Technologies
Buticchi, G. (PI)
12/10/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
Huang, L. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Impact of surface chemistry and deposited layers on the properties of electronic surface states in sub 10 nanometer bismuth films
Greer, J. (PI)
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
Zhang, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The technological development of 1.5T cryogen-free low-temperature superconductive magnet1.5T
Wang, C. (PI)
1/12/19 → 30/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Servo Actuator Thermal Analysis
Zhang, X. (PI)
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on control techniques of multi-phase fault-tolerant machines
Buticchi, G. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
Gu, C. (PI)
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
High Power Density High Reliability UAV Motor Drive
Zhang, X. (PI)
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on key issues of two-axis compensated air-core compulsators with high delivered energy density
Zhao, W. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
Wang, C. (PI)
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on torque ripple and common-mode voltage eliminations for multi-phase propulsion converters
Gu, C. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study of PMSM Control Strategy with Improved Phase Current Reconstruction Method
Yan, H. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
Li, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Control strategies of an Electro-mechanical braking system for automotives
Xu, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
Wang, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
SPMIC-UNNC &Advanced MRI workshop
Wang, C. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on basic issues of modular electrical machines with low torque ripple based on the carrier phase shift strategy
Zhao, W. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
5G-V2X adaptive and predictive handover scheme based on reinforced learning5G
Kwong, C. F. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on High-Power-Density Multi-Phase/Multi-Level Converters for Marine Propulsion System
Gu, C. (PI)
1/01/18 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Basic research of ironless core two axis compensated compulsators;
Zhao, W. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
A wearable medical sensor design with an integrated ultra-low power DSP ASIC for motion recognition and position tracking
Ni, W. (PI)
1/01/18 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on Design Optimization of Dual-Active-Bridge Power Converters for Energy Recovery Applications
Gu, C. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Advanced Laser Project
Wang, J. (PI)
1/09/17 → 31/08/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
AC/DC electric loading simulator for more electric aircraft
Zhang, A. (PI)
1/01/17 → 31/12/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
High Turbulence Heat Exchange and Optimised Control Strategy Study for Relative-Type Balanced Calorimeter
Zhang, A. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Four-dimensional Dopant Profiling for Rapid Prototyping and Fabrication of Nanoscale Semiconductor Devices Using Novel Combined SEM / FIB Techniques
Chee, K. (PI)
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on multi-physics field of high speed high power density electrical machine used for electrical propulsion
Zhao, W. (PI)
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
New ultra-high-speed 4D nanometer doping detection, drawing and prototyping, manufacturing: FIB-SEM combination process
Chee, K. (PI)
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Measurement Uncertainties on Efficiency Test of High-Efficiency Induction Machine
Zhang, A. (PI)
1/10/16 → 30/09/17
Project: Contract Projects › Horizontal-International Contract Projects
-
Arc fault detection and location for DC distribution systems
Li, J. (PI)
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The development of high-power starter generator and its controller
Zhang, A. (PI)
1/09/16 → 31/10/17
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
The Development of New Magnetic Resonance Imaging Technology
Wang, C. (PI)
1/08/16 → 31/07/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Key Technologies Research of Hybrid Power Generation System for Advanced Marine Ship Application
Zhang, A. (PI)
1/04/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Arc Fault Detection for grid-connected PV generation Systems
Li, J. (PI)
North China Electric Power University
1/01/15 → 31/12/16
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research and Development of Narrow Band Tunable Laser
Zhang, Y. (PI)
Zhejiang Jiayuan Photonic technology Co., Ltd
15/10/14 → 14/10/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-5.4- IAMET Project-Staff Development and Research Fund _HeZhang
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Semiconductor Nanodevice Characterisation and Fabrication and Rapid Prototyping Using Novel Combined SEM/FIB Techniques
Chee, K. (PI)
Ningbo Science and Technology Bureau
1/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.002-Key technologies research of traction mo
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
24/05/14 → 23/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects