Projects per year
Search results
-
UoN Cascade project Bamboo & Digital Fabrications Techniques - lead Hiroyuke Shinohara
Shinohara, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The Mutable Building Envelope: Seasonable Appearances
Reffat, R. (PI)
1/06/05 → 1/10/05
Project: Other Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
Xie, J. (PI)
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Zhou, T. (PI)
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Research on the Impact of New Technologies in Urban Renewal on Promoting the Development of New Urban Productivity
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
Deng, W. (PI)
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
Deng, W. (PI)
1/04/21 → 30/06/26
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on development guideline of China's new smart city, based on digital technologies
Tang, L. (PI)
3/01/18 → 30/05/18
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R. (PI)
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
Zhang, Z. (PI)
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Policy and Mechanism Study for Activating and Utilizing the Abandoned Rural House on Taogong Island, Dongqian Lake
Cheshmehzangi, A. (PI)
27/02/17 → 26/02/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Overseas Ningbo Memory 1200
1/06/21 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ningbo specific passive house technical guidance
Deng, W. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Ningbo Key Unmovable Heritage Smart Preservation and Traditional Art Inheritance
Deng, W. (PI), Liu, J. (CoI), Zhou, T. (CoI), Xie, J. (CoI), Ren, J. (CoI), Botti, G. (CoI), Loo, Y. M. (CoI), Zahran, E. S. M. M. (CoI), Zipprich, A. (CoI), Liang, R. (CoI) & Sima, Y. (CoI)
1/08/23 → 31/07/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Ningbo InnCity Annual Curation Event
Loo, Y. M. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Nansongyan Rural Beautification Landscape Design
Mangi, E. (PI) & Palmioli, A. (CoI)
1/08/23 → 30/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Life Cycle modeling and Design Knowledge Development in Virtual Environments.
Reffat, R. (CoPI) & Gero, J. S. (PI)
1/01/02 → 31/12/04
Project: Other Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L. (PI)
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Investigating Patterns of Architectural Features in Saudi Contemporary Architecture using Data Mining: Case Study (Riyadh, Jeddah, Dammam)
Reffat, R. (PI)
1/10/07 → 1/10/09
Project: Other Projects
-
INTERNATIONAL CALL FOR IDEAS AN ORGANIC PERSPECTIVE FOR ROME “A VISION FOR ROME”
Mangi, E. (PI), Palmioli, A. (CoPI), Buticchi, G. (CoI), Cooper, E. (CoI), Zhang, Y. (CoI), Towey, D. (CoI), Chan, F. (CoI), Hamm, N. (CoI), Bie, J. (CoI), Wang, Y. (CoI) & Caruso, G. (CoI)
26/05/25 → …
Project: Other Projects
File -
Intelligent Agents for Concept Invention of Design Forms
Reffat, R. (PI)
1/01/03 → 31/12/04
Project: Other Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. (CoPI) & Ramadan, A. (PI)
1/01/16 → 1/01/18
Project: Other Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
Reffat, R. (PI)
1/01/14 → 1/01/16
Project: Other Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of a Strategy-based Design Tool for Energy-Efficient Building Envelope of High-Rise Office Buildings in a Hot- Humid Climate
Reffat, R. (PI), Abdou, A. (CoI), Alhammad, A. (CoI), Cetin, M. (CoI), Hamid , S. (CoI) & Raharja , I. P. (CoI)
1/09/09 → 1/07/11
Project: Other Projects
-
Developing plans for the improvement of campus amenities and services
Reffat, R. (CoPI), Aldossary, A. (PI) & Alnaser, A. (CoI)
1/03/06 → 1/01/07
Project: Other Projects
-
Developing an Integration System to improve the Utilization of Smart Office Building Technologies in Saudi Arabia
Reffat, R. (PI)
1/09/05 → 1/11/06
Project: Other Projects
-
Developing a Computational Tool for a Sustainable Assessment of Intelligent Buildings in Saudi Arabia
Reffat, R. (PI), Abdou, A. (CoI) & Budaui, I. (CoI)
1/02/12 → 1/02/14
Project: Other Projects
-
Collection and Archiving for the Historical Documents of Zhejiang Old Custom (Phase I)
Xie, J. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects