Projects per year
Search results
-
01.03.08.01.4042-2012-2013 Energy and low income tropical housing-EPSRC/DFID-Ali Cheshmehzangi
Cheshmehzangi, A. (PI)
Engineering and Physical Sciences Research Council
17/10/14 → 16/10/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
3D Digitalization for the Historic Site of Zhejiang Custom House in Ningbo
Xie, J. (PI)
22/06/21 → 10/03/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J. (PI), Lu, J. (PI), Zhou, T. (PI) & Deng, W. (PI)
9/09/21 → 24/06/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
86 model Windows System
Mangi, E. (PI)
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
An Alternative Pathway for the Sustainable Development: The development of Campus-based Sustainability Assessment Tool (CSAT) for Chinese Cities
Dawodu, A. (PI)
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Analyzing the Impact of IT-based Curriculum on Undergraduate Students’ Learning in Architecture at KFUPM
Reffat, R. (PI)
1/09/06 → 31/08/07
Project: Other Projects
-
Application and Implementation of AI Algorithm in HVAC
Zhang, Z. (PI)
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
A Prototype of Concept-Invention Agents to support Design Creativity
Reffat, R. (PI)
1/01/02 → 31/12/02
Project: Other Projects
-
Architecture prototyping based energy retrofit for office buildings
Deng, W. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
A Semantic-Based Virtual Design Environment for Digital Designing in Architecture
Reffat, R. (PI), El-Sebakhy, E. (CoI), Khaeruzzaman, Y. (CoI) & Raharja, I. P. (CoI)
1/09/06 → 1/06/08
Project: Other Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J. (PI), Lu, J. (CoI), Deng, W. (PI) & Zhou, T. (PI)
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Modelling Service for Ningbo Elderly Care Service Centre-Phase II
Xie, J. (PI), Zhou, T. (CoI) & Lu, J. (CoI)
1/09/23 → 31/08/25
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Technology and Culture Symposium
Mangi, E. (PI), Botti, G. (CoPI), Chen, W. (CoI) & Shinohara, H. (CoPI)
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
CIBSE support fund
Xia, L. (PI)
31/05/18 → 31/05/19
Project: Contract Projects › Horizontal-International Contract Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Collection and Archiving for the Historical Documents of Zhejiang Old Custom (Phase I)
Xie, J. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Developing a Computational Tool for a Sustainable Assessment of Intelligent Buildings in Saudi Arabia
Reffat, R. (PI), Abdou, A. (CoI) & Budaui, I. (CoI)
1/02/12 → 1/02/14
Project: Other Projects
-
Developing an Integration System to improve the Utilization of Smart Office Building Technologies in Saudi Arabia
Reffat, R. (PI)
1/09/05 → 1/11/06
Project: Other Projects
-
Developing plans for the improvement of campus amenities and services
Reffat, R. (CoPI), Aldossary, A. (PI) & Alnaser, A. (CoI)
1/03/06 → 1/01/07
Project: Other Projects
-
Development of a Strategy-based Design Tool for Energy-Efficient Building Envelope of High-Rise Office Buildings in a Hot- Humid Climate
Reffat, R. (PI), Abdou, A. (CoI), Alhammad, A. (CoI), Cetin, M. (CoI), Hamid , S. (CoI) & Raharja , I. P. (CoI)
1/09/09 → 1/07/11
Project: Other Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
Reffat, R. (PI)
1/01/14 → 1/01/16
Project: Other Projects
-
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy Data Investigation Service Phase III
1/07/24 → 27/03/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. (CoPI) & Ramadan, A. (PI)
1/01/16 → 1/01/18
Project: Other Projects
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace-Phase 2
Cheshmehzangi, A. (PI)
2/07/21 → …
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Identifying Rural Cultural Landscape from Village Place Names:Mapping for “Ecological Civilization” in the Lower Yangzi Delta
Palmioli, A. (PI)
1/01/21 → 31/12/25
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Intelligent Agents for Concept Invention of Design Forms
Reffat, R. (PI)
1/01/03 → 31/12/04
Project: Other Projects
-
INTERNATIONAL CALL FOR IDEAS AN ORGANIC PERSPECTIVE FOR ROME “A VISION FOR ROME”
Mangi, E. (PI), Palmioli, A. (CoPI), Buticchi, G. (CoI), Cooper, E. (CoI), Zhang, Y. (CoI), Towey, D. (CoI), Chan, F. (CoI), Hamm, N. (CoI), Bie, J. (CoI), Wang, Y. (CoI) & Caruso, G. (CoI)
26/05/25 → …
Project: Other Projects
File -
Investigating Patterns of Architectural Features in Saudi Contemporary Architecture using Data Mining: Case Study (Riyadh, Jeddah, Dammam)
Reffat, R. (PI)
1/10/07 → 1/10/09
Project: Other Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L. (PI)
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects
-
Life Cycle modeling and Design Knowledge Development in Virtual Environments.
Reffat, R. (CoPI) & Gero, J. S. (PI)
1/01/02 → 31/12/04
Project: Other Projects
-
Nansongyan Rural Beautification Landscape Design
Mangi, E. (PI) & Palmioli, A. (CoI)
1/08/23 → 30/10/25
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Ningbo InnCity Annual Curation Event
Loo, Y. M. (PI)
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Ningbo Key Unmovable Heritage Smart Preservation and Traditional Art Inheritance
Deng, W. (PI), Liu, J. (CoI), Zhou, T. (CoI), Xie, J. (CoI), Ren, J. (CoI), Botti, G. (CoI), Loo, Y. M. (CoI), Zahran, E. S. M. M. (CoI), Zipprich, A. (CoI), Liang, R. (CoI) & Sima, Y. (CoI)
1/08/23 → 31/07/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅局级) Funded Projects