Projects per year
- 1 - 50 out of 55 results
Search results
-
Finished
Energy Data Investigation Service
26/12/23 → 6/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Building Modelling Service for Ningbo Elderly Care Service Centre
Xie, J. (PI), Lu, J. (CoI), Deng, W. (PI) & Zhou, T. (PI)
19/12/22 → 31/03/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Yinzhou district 2023
Loo, Y. M. (PI)
8/12/22 → 31/10/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Achieving “Double Carbon” goal: current international situation, technical advancement and policy suggestions for Ningbo
Deng, W. (PI)
26/10/22 → 30/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Altas and technology proposals for ultra-low energy building of villages in Ningbo
Deng, W. (PI), Zhou, T. (CoI), Zhang, Z. (CoI) & Xie, J. (PI)
15/09/22 → 18/12/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
City Tour-Dongqian Lake 2022
Loo, Y. M. (PI)
1/09/22 → 30/09/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Dynamic simulation and analysis for heating and air-conditioning energy load of old communities in Ningbo – a case study of Huamao Teachers’ Apartment of Zhonggongmiao subdistrict
Zhang, Z. (PI), Deng, W. (CoI) & Zhou, T. (CoI)
1/08/22 → 26/06/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Building Technology and Culture Symposium
Mangi, E. (PI), Botti, G. (CoPI), Chen, W. (CoI) & Shinohara, H. (CoPI)
18/03/22 → 30/09/23
Project: Contract Projects › Horizontal-International Contract Projects
-
Product development and application of physics-based+data-driven hybrid energy modeling for industrial HVAC systems
Zhang, Z. (PI)
1/03/22 → 11/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Future Community, Future City
Loo, Y. M. (PI)
18/12/21 → 30/01/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
3D Scanning Service for Migration Project for the Cultural Relics in the Lunan City Renew Zone
Xie, J. (PI), Lu, J. (PI), Zhou, T. (PI) & Deng, W. (PI)
9/09/21 → 24/06/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
3D Digitalization for the Historic Site of Zhejiang Custom House in Ningbo
Xie, J. (PI)
22/06/21 → 10/03/23
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
86 model Windows System
Mangi, E. (PI)
20/06/21 → 20/06/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Architecture prototyping based energy retrofit for office buildings
Deng, W. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Overseas Ningbo Memory 1200
1/06/21 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development of green façade design feature to enhance livability, sustainability and energy conservation in residential buildings
Lun, I. Y. F. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Development Strategy and Application of Green Building for the Southern Zone of Ningbo New East Town
Deng, W. (PI)
1/04/21 → 1/04/24
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Evaluation of building safety signs based on eye tracking technology
Xia, L. (PI)
12/01/21 → 31/12/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
An Alternative Pathway for the Sustainable Development: The development of Campus-based Sustainability Assessment Tool (CSAT) for Chinese Cities
Dawodu, A. (PI)
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Innovative Approaches for Improving Sustainability of University Campuses in Egypt
Reffat, R. (PI) & Yousef, W. (CoI)
2/12/20 → 2/06/23
Project: Other Projects
-
ICT-Mediated and Digital Technologies for Resilience of Cities (IDRC): Sustainability Pathways to meet Positive Peace
Cheshmehzangi, A. (PI)
1/11/20 → 31/03/22
Project: Contract Projects › Horizontal-International Contract Projects
-
Application and Implementation of AI Algorithm in HVAC
Zhang, Z. (PI)
15/10/20 → 14/10/23
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
Xie, J. (PI)
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Integrated City Information Modelling (iCIM): Innovating an advanced multiple urban modelling platform
Cheshmehzangi, A. (PI)
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
Deng, W. (PI)
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Fostering BIM Implementation in Egypt
Reffat, R. (CoPI), Morad, S. (PI), Hassanain, M. (CoI) & Sayed, E. (CoI)
1/10/19 → 1/03/21
Project: Other Projects
-
Ningbo specific passive house technical guidance
Deng, W. (PI)
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
Xia, L. (PI)
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A. (PI)
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development of indoor thermal comfort index during the plum rain season in Coastal East China – Taking Ningbo for example
Zhou, T. (PI)
1/10/18 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
UoN Cascade project Bamboo & Digital Fabrications Techniques - lead Hiroyuke Shinohara
Shinohara, H. (PI)
1/08/18 → 31/07/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research and exploration on the comprehensive utilization of the Sangjia block
Cheshmehzangi, A. (PI)
10/06/18 → 30/09/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
CIBSE support fund
Xia, L. (PI)
31/05/18 → 31/05/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Research on development guideline of China's new smart city, based on digital technologies
Tang, L. (PI)
3/01/18 → 30/05/18
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Policy and Mechanism Study for Activating and Utilizing the Abandoned Rural House on Taogong Island, Dongqian Lake
Cheshmehzangi, A. (PI)
27/02/17 → 26/02/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A. (PI)
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Energy grade of solar auxiliary heat pump system based on ultrathin superconducting absorber
Xia, L. (PI)
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Fostering Creativity Skills using Modern Teaching Strategies for Preparatory Year Students at Saudi Universities
Reffat, R. (CoPI) & Ramadan, A. (PI)
1/01/16 → 1/01/18
Project: Other Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Zhou, T. (PI)
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L. (PI)
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R. (PI)
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.08.01.4042-2012-2013 Energy and low income tropical housing-EPSRC/DFID-Ali Cheshmehzangi
Cheshmehzangi, A. (PI)
Engineering and Physical Sciences Research Council
17/10/14 → 16/10/19
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Effective Utilization of Daylighting Systems for Energy Efficiency in Buildings in Egypt
Reffat, R. (PI)
1/01/14 → 1/01/16
Project: Other Projects
-
Developing a Computational Tool for a Sustainable Assessment of Intelligent Buildings in Saudi Arabia
Reffat, R. (PI), Abdou, A. (CoI) & Budaui, I. (CoI)
1/02/12 → 1/02/14
Project: Other Projects
-
Development of a Strategy-based Design Tool for Energy-Efficient Building Envelope of High-Rise Office Buildings in a Hot- Humid Climate
Reffat, R. (PI), Abdou, A. (CoI), Alhammad, A. (CoI), Cetin, M. (CoI), Hamid , S. (CoI) & Raharja , I. P. (CoI)
1/09/09 → 1/07/11
Project: Other Projects
-
Investigating Patterns of Architectural Features in Saudi Contemporary Architecture using Data Mining: Case Study (Riyadh, Jeddah, Dammam)
Reffat, R. (PI)
1/10/07 → 1/10/09
Project: Other Projects
-
A Semantic-Based Virtual Design Environment for Digital Designing in Architecture
Reffat, R. (PI), El-Sebakhy, E. (CoI), Khaeruzzaman, Y. (CoI) & Raharja, I. P. (CoI)
1/09/06 → 1/06/08
Project: Other Projects
-
Analyzing the Impact of IT-based Curriculum on Undergraduate Students’ Learning in Architecture at KFUPM
Reffat, R. (PI)
1/09/06 → 31/08/07
Project: Other Projects
-
Developing plans for the improvement of campus amenities and services
Reffat, R. (CoPI), Aldossary, A. (PI) & Alnaser, A. (CoI)
1/03/06 → 1/01/07
Project: Other Projects