Search concepts
|
Selected filters
|
- 100 - 150 out of 615 results
- Export search results
Search results
-
Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
Shi, Y. (PI)
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
SPMIC-UNNC &Advanced MRI workshop
Wang, C. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Zhang, A. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Zhou, T. (PI)
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-5.1- IAMET Project-Staff Development and Research Fund _Chris Gerada
Gerada, C. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Physical simulation and active control of interface defects in drilling of CFRP/alloy laminated structure CFRP-
Liu, G. (PI)
1/11/20 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Unified Information System Based Supply Chain Integration and Optimisation for Intermodal Transportation: A Study on Ningbo Port
Chan, H. K. (PI)
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the innovation and integration of electronic commerce economy and big data in Ningbo
Liu, M. (PI)
1/06/16 → 31/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Reflections and suggestions on the reform of local financial regulatory system in China – using Ningbo as an example
Hua, X. (PI)
1/09/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the trend of international technology transfer in the post-epidemic era and countermeasures in Ningbo
Hua, X. (PI)
1/06/20 → 31/10/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Impact of Financial Inclusion on Systematic Risk
Hua, X. (PI)
14/05/18 → 13/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R. (PI)
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
Halim, D. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Nano fluids of low-dimensional carbon nanomaterials and synthetic organic heat transfer oil
Peng, C. (PI)
1/03/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
Gu, C. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Frequency response analysis of a modular multilevel power converter for multi-terminal HVDC applications
Xu, J. (PI)
1/12/20 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the strategy of service-oriented transformation and upgrading of manufacturing enterprises in Ningbo
Liu, M. (PI)
Ningbo Science and Technology Bureau
1/06/15 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on optimal allocation of investment and consumption in incomplete market
Zhang, Y. (PI)
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
Yi, X. (PI)
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Key Technology of Bridge Deformation Monitoring Based on Multi-Frequency BDS / GPS
Hancock, C. (PI)
1/10/17 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study on the Countermeasures of strengthening the Cooperation of "Belt and Road" International Science and Technology Innovation in Ningbo "
Liu, C. (PI)
1/05/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
A Study on the Prospect of " 16+1 " Trade and Economic Cooperation Demonstration Zone in Ningbo
Liu, C. (PI)
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
light-weight and high-strength SMC Composites Materials
Liu, X. (PI)
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
How can UNNC further contribute to the internalization process of Ningbo city
Liu, C. (PI)
2/01/17 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Key Technologies of Collaborative AGV Scheduling for Complex Digital Twin Systems
Bai, R. (PI), Ren, J. (CoI), Yao, Y. (CoI) & ULLAH, F. (CoI)
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Architecture prototyping based energy retrofit for office buildings
Deng, W. (PI)
1/06/21 → 31/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z. (PI), Hong, Y. (CoPI), Xi, W. (CoPI), Shao, J. (CoPI), Deng, W. (CoI), Zhou, T. (CoI), Xia, L. (CoI), Lun, I. Y. F. (CoI) & Lu, J. (CoI)
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Ningbo Philosophy and Social Science Research Base (cultivation category)
Liu, X. (PI)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
“思政生活化”背景下中外合作高校第二课堂体系建设
Bian, K. (PI)
15/09/23 → 30/09/25
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
File -
Research on key problems of multi-objective dynamic compensation for capacitive power systems based on hybrid passive network matrix
Huang, L. (PI), Xu, J. (CoI) & Bai, S. (CoI)
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Logistic scheduling
Bai, R. (PI), Bargiela, A. (CoI) & Anberree, T. (CoI)
1/02/08 → 28/02/10
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research and Applications of Search with Evolutionary Ruin and Stochastic Rebuild
Bai, R. (CoI)
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
Pang, C. H. (PI)
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Summit Forum on the Key Technology of Heat Management in New Energy Vehicle
Yan, Y. (PI)
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Pilot Reform Project-High level Sino-Foreign University Building
Liu, S. (PI)
1/03/17 → 30/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on Financial Inclusion Index based on China Financial Inclusion Index System (2016)
Hua, X. (PI)
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Financial Consumer Rights Protection Assessment
Hua, X. (PI)
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the current situation of corporate leverage and the path of deleveraging
Hua, X. (PI)
1/06/17 → 31/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
Chen, H. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Cultural heritage and cross-border communication studies along the land/maritime silk road in the digital age: Construction of an open and VR-available cloud-based heritage database with social function
Ch'ng, E. (PI)
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Development of multifunctional low-pollution waterborne coatings
Hu, B. (PI)
Ningbo Science and Technology Bureau
23/05/14 → 22/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-2-IAMET Project-3315 Innovation team (Project 2)_George Chen
Chen, G. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the innovation and entrepreneurship ecosystem and policy support system in Ningbo
Hofman, P. (PI)
1/12/16 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C. (PI)
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
01.03.14.01.2014.04.001-4-IAMET Project-3315 Innovation team? (Operational Budget)_Chris Gerada
Gerada, C. (PI)
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Analysis on the present situation and prospect of service industry for international students in Ningbo
Liu, C. (PI)
1/11/20 → 31/10/21
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Reconstructing the origin and spread of Asian rice based on Geographic Information System and Bayesian modelling
Long, T. (PI)
1/02/21 → 31/01/23
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Research on the Influence of Non-governmental Organizations on the Sustainable Development of Textile and Apparel Industry in Ningbo
Moosmayer, D. (PI)
Ningbo Science and Technology Bureau
1/09/12 → 31/08/13
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects