Search concepts
|
Selected filters
|
- 100 - 150 out of 581 results
Search results
-
Study on how to extend the healthcare international collaboration through the University of Nottingham Ningbo China
Hsieh, C.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on dual structural vibration and acoustic control using the coupled Helmholtz resonator and membrane-type metamaterial
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on digital media use and identification with Ningbo city image: Using Expatriates and Chinese returners from overseas to Ningbo as the example
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on countermeasures to further stimulate the vitality of microeconomic subjects and promote the high-quality development of private and small and medium-sized enterprises in Ningbo
1/01/20 → 30/11/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Study on carbon-based lightweight and non-metallic lightning strike protection material for commercial airplane
1/11/20 → 31/10/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Study of PMSM Control Strategy with Improved Phase Current Reconstruction Method
Yan, H.
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Study of Financial Products and Consumer Segmentation
1/09/16 → 31/08/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study and demonstration of low carbon design and optimization of integrated energy systems in communities
Zhang, Z., Hong, Y., Xi, W., Shao, J., Deng, W., Zhou, T., Xia, L., Lun, I. Y. F. & Lu, J.
1/07/22 → 30/06/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Studies of the Biomimetic Total Synthesis of Providencin
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Structural Health Monitoring of Infrastructure in Logistics Cycle
Hancock, C.
1/07/15 → 30/06/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Stress state variation and shakedown analysis of trackbed under repeated moving train loads
National Natural Science Foundation of China (NSFC)
1/01/15 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Strategic Path for Ningbo Promoting Trade Ties with countries along the OBOR under the new era
1/09/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
SPMIC-UNNC &Advanced MRI workshop
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Speed Up the Establishment of Ningbo International Chamber of Commerce New Business Models Referring to British Chamber of Commerce Business Model
1/10/17 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Spatial Form Research on the North Block and Surrounding Area of Wulin High School, Xikou Town
27/08/20 → 31/12/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Solution for the information system of the building structure and its components
Lu, J.
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Solar-thermochromism of Ionic Liquid-Transition Metal Complexes Based Films and Their Application in Smart Windows
Yu, L.
Zhejiang University of Science and Technology
1/01/17 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
soil properties under double non-coaxiality and principal stress rotation
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Soil behaviour under bidirectional non-coaxiality and principal stress rotation
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Smart Eco-cities for a green economy: a comparative study of Europe and China
Tan, P. M.
National Natural Science Foundation of China (NSFC)
1/09/14 → 31/08/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Shaping the Connected Museum-Mixed Reality Museum
Ch'ng, E.
1/02/23 → 1/02/24
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Shaping the Connected Museum
Ch'ng, E.
1/08/20 → 31/07/23
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Shakedown analysis of pile group in sand under cyclic lateral loads and its deformation development mechanism
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Servo Actuator Thermal Analysis
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Semiconductor Nanodevice Characterisation and Fabrication and Rapid Prototyping Using Novel Combined SEM/FIB Techniques
Chee, K.
Ningbo Science and Technology Bureau
1/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Self-Powered Environment Sensing based on Novel Electret Materials and Flexible Energy-Generating Devices
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Robust Data Mining Technologies and Their Applications in Cold Chain Logistics Big Data Analytics
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Road to power? The Political Effects of Infrastructure Projects
Tan, P. M.
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Roads to integration: The role of Transport Infrastructure in the Domestic Market Integration in China
1/01/20 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Retention and recruitment of migrant nurses post-Brexit
Spiliopoulos, J.
21/01/19 → 31/07/19
Project: Contract Projects › Horizontal-International Contract Projects
-
Resources for Interculturality in Chinese Higher Education/ RICH-Ed
1/08/18 → 14/04/21
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Resource Recycling Technology Research and Demonstration for Retired Power Batteries
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research Workshop on Digital Innovation and New Venture Extention
1/01/21 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on what drives Zhejiang and China’s firms to create original innovations
1/01/21 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on Variable Structure Compensation Networks of Capacitive Power Trans fer Systems
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on torque ripple and common-mode voltage eliminations for multi-phase propulsion converters
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Research on the trend of international technology transfer in the post-epidemic era and countermeasures in Ningbo
1/06/20 → 31/10/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the strategy of service-oriented transformation and upgrading of manufacturing enterprises in Ningbo
Ningbo Science and Technology Bureau
1/06/15 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the role of enterprises in talent recruitment in during the period of “14th Five-Year Plan” “
13/12/19 → 30/03/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the innovation and integration of electronic commerce economy and big data in Ningbo
1/06/16 → 31/05/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the innovation and entrepreneurship ecosystem and policy support system in Ningbo
Hofman, P.
1/12/16 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Influence of Non-governmental Organizations on the Sustainable Development of Textile and Apparel Industry in Ningbo
Moosmayer, D.
Ningbo Science and Technology Bureau
1/09/12 → 31/08/13
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the current situation of corporate leverage and the path of deleveraging
1/06/17 → 31/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of Ningbo to Accelerate the Development of Service Trade
10/12/19 → 30/06/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects