Projects per year
Projects
- 7 Finished
Search results
-
Finished
Multi-phase Motor Drive Technology for Multil-wing Drone
Li, J. (PI)
7/12/20 → 30/06/21
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Fault diagnoses for motor drives of the EV application
Li, J. (PI)
Zhejiang Provincial Human Resources and Social Security Department
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
self-sensing permanet magnet sychronous machine and its sensor-less control algorithm
Li, J. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
High Efficiency and Low Noise BLDC Research and Industrialization
Li, J. (PI)
1/08/18 → 31/07/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
Li, J. (PI)
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Arc fault detection and location for DC distribution systems
Li, J. (PI)
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Arc Fault Detection for grid-connected PV generation Systems
Li, J. (PI)
North China Electric Power University
1/01/15 → 31/12/16
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects