Projects per year
Projects
- 5 Finished
Search results
-
Finished
Research on Blast Furnace-based Technologies of Harmless Treatment and Resource Utilization of Fly Ash from Municipal Solid Waste Incineration
Xu, M. (PI), Li, B. (CoI) & Kow, K. W. (CoI)
1/01/22 → 31/12/24
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
Li, B. (PI)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Flexural behaviour of reinforced concrete beam strengthened by fabric reinforced alkali-activated mortar
Li, B. (PI)
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial/Ministerial Government(省部级) Funded Projects
-
Flexural Performance of Reinforced Concrete Beam Strengthened by Fabric Reinforced Geopolymer Composites
Li, B. (PI)
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal/Departmental Government (市厅级) Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
Li, B. (PI)
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects