Projects per year
- 200 - 250 out of 361 results
Search results
-
Study of the real-time and multi-point sensing Fiber Bragg Grating Biosensor with the evanescent field enhanced by Surface Plasmon Resonance technology
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Towards seamlessly integrated, reliable machines – A 90kW, 5kW/kg aerospace electrical motor/generator
Galea, M.
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Thermoplastic composite reinforced by continues fibres by fasting processing
1/01/19 → 31/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on key issues of two-axis compensated air-core compulsators with high delivered energy density
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Self-Powered Environment Sensing based on Novel Electret Materials and Flexible Energy-Generating Devices
1/01/19 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Innovation for Sustainable City: Integrating Nature-Based Solutions in China’s Eco-Development
Cheshmehzangi, A.
1/01/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The Enhancement of Molten Salt Electro-Deoxidation Process for Titanium Alloys Production via the Application of Metal Co-Oxide Cathodes
1/01/19 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Content service for the construction of medical question answering system knowledge base
16/01/19 → 15/01/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Envisioning new Blue-Green futures: multifunctional infrastructure to address warter challenges
31/01/19 → 31/07/20
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Application of PEI-Veil in flame-retardant and Toughened Composite Materials PEI-Veil
14/02/19 → 31/12/21
Project: Contract Projects › Horizontal-International Contract Projects
-
Recycling of construction and excavation waste soil into value-added non-sintering concrete blocks)
1/03/19 → 28/02/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Capital market database development
Lu, J.
1/03/19 → 31/10/22
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Development and Application of "Internet" Industrial Boiler remote Monitoring system“
1/04/19 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Bilateral Workshop on Fundamental Study and Applications of Micro/nano Scale Multiphase Thermal and Mass Transport
1/04/19 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Improvement of Performance for Cooling System in Subway Station Based on Big Data Analysis
31/05/19 → 1/04/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Toughening and Structural Optimization study of Carbon Fibre Laminates under tension
1/06/19 → 31/12/20
Project: Government Funded Projects › Vertical-Other Provinces and Cities Government Funded Projects
-
Mobile phone acquisition data crawling and data structure system
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Key technological enhancement and applications for Ningbo port Terminal operating system
30/06/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The experimental and modelling of oxidation and interdiffusion between thermal barrier coatings and single-crystal superalloys
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D.
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Resource Recycling Technology Research and Demonstration for Retired Power Batteries
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo specific passive house technical guidance
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi-fuel, high reliable solid oxide fuel cell stack technology
Konysheva, E.
1/07/19 → 1/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Power Generation Technology of Thermoelectric and Heat Pipe for waste Heat Utilization of Automobile exhaust Gas
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration energy flow analysis of fibre-reinforced composite laminates
1/07/19 → 30/06/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
有机固废的高效清洁能源化转化技术
Ningbo Science and Technology Bureau
30/07/19 → 29/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The 3rd International Conference on Intelligent Manufacturing and Advanced Machining
24/08/19 → 25/08/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Ambient Temperature High Speed Electrical Drive System Development Technology Agreement
Galea, M.
1/09/19 → 30/04/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
NMI_3315 Innovation Team_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
NMI_3315 Innovation Team Talent Fund_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Development of Alternative Feeding Antibiotic Products from Herbs
30/09/19 → 31/07/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
File -
Fostering BIM Implementation in Egypt
Reffat, R., Morad, S., Hassanain, M. & Sayed, E.
1/10/19 → 1/03/21
Project: Other Projects
-
High Power Density High Reliability UAV Motor Drive
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Planetary Mixer Design
31/10/19 → 29/02/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Solution for the information system of the building structure and its components
Lu, J.
1/11/19 → 31/10/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
DOMINANT: Development of an Efficient Plug-n-Play and Real-Time Remote Health Monitoring System;
1/11/19 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on control techniques of multi-phase fault-tolerant machines
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Development of a high-power multi-phase fault-tolerant machine drive
19/11/19 → 30/09/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Servo Actuator Thermal Analysis
25/11/19 → 31/12/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Publish the paper: Modelling of mass transfer for gas-liquid two-phase flow in bubble columnreactor with a bubble breakage model considering bubble-induced turbulence
26/11/19 → 15/07/20
Project: University Funded Projects › Internal-Others University Funded Projects
-
The technological development of 1.5T cryogen-free low-temperature superconductive magnet1.5T
1/12/19 → 30/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development of Propoerty-Improvement of High-Temperature Cure, Full Green Composites
17/12/19 → 17/06/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Research on the energy-saving oriented technology of civil architecture classification and the pilot project study of relevant energy saving technology implementation in Cixi
31/12/19 → 30/11/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Reconstructions of ice thickness distribution and volume during the Maximum Glaciation and LGM in eastern Hengduan Mountain: from Shaluli Shan to Min Shan
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Turbulence characteristics and ultrasonic intensification mechanism of transfer processes of impinging jet flow
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Zhejiang Ten Thousand Talent Scheme-Innovation Leading Talent
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects