Search concepts
|
Selected filters
|
- 350 - 400 out of 578 results
Search results
-
Vertical-Ningbo Municipal Government Funded Projects
01.03.14.01.2014.04.001-5.3- IAMET Project-Staff Development and Research Fund _YJ(400k for personal remuneration & 100k for research related activities)
Gerada, C.
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Indoor Air Pollution Control Technology
1/01/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research Base on Ningbo Dual Circulation and New Economic Development
11/11/20 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Eco-friendly, high performance and multi-functional green building composites and its application technology
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
NMI_3315 Innovation Team_高性能柔性触觉传感器批量制造的关键技术及产业化_朱光
Ningbo Science and Technology Bureau
1/09/19 → …
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A.
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the trend of international technology transfer in the post-epidemic era and countermeasures in Ningbo
1/06/20 → 31/10/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
SPMIC-UNNC &Advanced MRI workshop
1/10/18 → 31/10/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Physical simulation and active control of interface defects in drilling of CFRP/alloy laminated structure CFRP-
1/11/20 → 31/10/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Recycling and Reuse of Waste Concrete in Ningbo Construction Industry
Jin, R.
Ningbo Science and Technology Bureau
1/03/15 → 1/03/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Empirical Analysis on Hospital Leadership
National Health Commission Capacity Building and Continuing Education Center
1/03/20 → 28/02/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Utilization of internal-CO2 curing in cement-based materials by using porous carriers
Kow, K. W., Xu, M., Fow, K. L. & Sun, Y.
1/09/21 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi - objective optimization theory and method for waste recycling of electronic products
Gu, F.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
01.03.14.01.2014.04.001-1-3315 Innovation team project--He Zhang
Ningbo Science and Technology Bureau/Finance Bureau
1/10/14 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The tropospheric delay modeling for improving the PPP precision in the structure monitoring applications
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the plan and policy of industrialization of green recycled building wall components in Ningbo
Ningbo Science and Technology Bureau
1/01/16 → 31/12/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Design of non-carbonate based electrolyte solution and investigation of the formation mechanism of interfacial surface film on the lithium-rich manganese-based cathode for Lithium-ion batteries
Xia, L.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on basic issues of modular electrical machines with low torque ripple based on the carrier phase shift strategy
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investment in renewable energy and clean technologies in the area of marine
Hofman, P.
1/01/13 → 31/12/14
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Effect of char formation on its dielectric property at high temperature in microwave pyrolysis of biomass and study on microwave enhanced mechanism of char surface reaction
Natural Science Foundation of Ningbo
6/01/17 → 1/01/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
NMI_Science & Technology Innovation 2025 Key Programme - Development of Resource Recovery Equipment for Organic Waste and Project Demonstration_Kaiqi Shi
Ningbo Science and Technology Bureau
1/01/18 → 31/12/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The research of new 3D HDR multi-focused images fusion technologies and application in digital microscope
2/03/15 → 1/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Advanced Control and Modulation Methods of Multiple-Active-Bridge (MAB) Converters for Micro-Grid Applications
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Flavour modification and analytical authentication of composite fruit juices
1/12/18 → 30/11/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
How can UNNC further contribute to the internalization process of Ningbo city
2/01/17 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The Influence of the Expansion of the National Stock Transfer Listing System on the Financing of High-Tech Enterprises in the Province
Ningbo Science and Technology Bureau
1/06/15 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the Countermeasures of strengthening the Cooperation of "Belt and Road" International Science and Technology Innovation in Ningbo "
1/05/18 → 31/12/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on Freshmen Adaptation in Sino-Foreign Universities
Zhou, M.
1/06/18 → 30/06/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
High Power Density High Reliability UAV Motor Drive
1/10/19 → 30/09/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A study on the deepening of the reform of the commercial registration system in Ningbo
Ge, J.
14/12/17 → 13/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D.
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the current situation of International quality Educational Resources in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Pilot Reform Project-High level Sino-Foreign University Building
1/03/17 → 30/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Philosophy and Social Science Research Base (cultivation category)
1/01/21 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Researching the participation of universities and colleges in the education of the elderly.
18/05/22 → 18/05/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Vibration suppression and energy flow tailoring with inerter-based metamaterial structures
1/09/22 → 31/08/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on digital twin based key technologies for multi-AGV scheduling and cooperation in complex systems
Bai, R., Ren, J., Yao, Y. & Ullah, F.
1/04/23 → 31/03/26
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the deformation of biopolymer treated waste soils under traffic loads
1/01/22 → 31/12/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Ningbo Engineering Research Center for the Comprehensive Application of Organic Solid Waste
10/09/21 → 9/09/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Technology and control system development for gasoline powered vehicles to meet emission standard China 6--Database-based emission simulation modeling
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Active Vibration Suppression of Rotating Structures using Disturbance-Estimation-Based Control
Halim, D., Mareta, S., Ran, L., Xu, J., Huang, L. & Lin, T.
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research and Applications of Search with Evolutionary Ruin and Stochastic Rebuild
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Logistic scheduling
Bai, R., Bargiela, A. & Anberree, T.
1/02/08 → 28/02/10
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Key Technologies of Blast Furnace-based Co-Processing of Fly Ash from Municipal Solid Waste Incineration
30/06/21 → 30/06/24
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Forum on Carbon Neutrality (Ningbo)
1/07/21 → 4/08/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
High temperature creep behaviour of thermal barrier coatings
1/10/18 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on Typical Models and Supporting System for Reconciling SMEs with Large Enterprises
Zhou, M.
18/12/18 → 31/07/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on the influence of steel fiber and polyvinyl alcohol fiber concrete on the performance of bridge and bridge end transition slab
Ningbo Science and Technology Bureau
30/06/14 → 31/05/16
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects