Search concepts
|
Selected filters
|
- 250 - 300 out of 579 results
Search results
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020
1/12/20 → 31/03/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
International Symposium on Numerical Methods in Heat and Mass Transfer 2020 ISNMHMT2020
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
International Workshop on Green Airports Technologies
12/10/20 → 15/07/21
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Internet+ Smart Triage Tool and its application in Ningbo Hospital
1/12/18 → 30/11/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigating Patterns of Architectural Features in Saudi Contemporary Architecture using Data Mining: Case Study (Riyadh, Jeddah, Dammam)
1/10/07 → 1/10/09
Project: Other Projects
-
Investigation of failure behaviour induced by the high temperature creep of thermal barrier coatings via small punch testing method
1/01/20 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation of micro-plastics in the Chinese urban river catchment: the case of Ningbo
1/01/19 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation of the solar photovoltaic/thermal and phase change material integrated greenhouse for ecological agriculture development
Tang, L.
1/12/15 → 30/11/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation of Water Quality in Ningbo In Relation To Land-cover Type
Griffiths, J.
Ningbo Science and Technology Bureau
1/09/14 → 22/07/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
"Investigation on gas-liquid-solid three phase flow coupled with meso-scale particle-bubble interactions, particle-liquid turbulence and bubble induced turbulence in bubble column reactors"
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on gas-liquid-solid three phase flow coupled with meso-scale solid-liquid turbulence and bubble induced turbulence in bubble column reactors
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on gas-liquid-solid three phase flow coupled with meso-scale solid-liquid turbulence and bubble induced turbulence in bubble column reactors
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on talents in Yinzhou District's industrial foundation
27/02/19 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on the coordination conduct within the heavy metal oxyanions and non-metal functionalities during the environmental remediation processes
1/01/22 → 31/12/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investigation on the current situation of International quality Educational Resources in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Investigations of power flow characteristics of nonlinear vibration isolation systems
1/01/17 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Investment in renewable energy and clean technologies in the area of marine
Hofman, P.
1/01/13 → 31/12/14
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
IR spectroscopic investigations into pyridine based catalysts for the photochemical reduction of CO2
National Natural Science Foundation of China (NSFC)
1/01/17 → 31/12/17
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Job Creation and Destruction: Study on Mechanism and Empirics of the Effects of Digital Trade in China
Zhou, M.
1/01/20 → 31/12/23
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Key Laboratory for Carbonaceous Wastes Processing and Process Intensification Research of Zhejiang Province )
1/01/20 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Key technical research on thermal management of gasoline direct-injection engine used vehicle
1/03/15 → 31/03/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Key technological enhancement and applications for Ningbo port Terminal operating system
30/06/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Key Technologies Research of Hybrid Power Generation System for Advanced Marine Ship Application
1/04/15 → 31/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Key Technology and Application demonstration of HPP Natural Fruit and vegetable Juice processing HPP
30/09/18 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Korean Culture Week - Korean Wave
3/01/20 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Laminar Flow Control and Drag Reduction using Biomimetically inspired Micro-Features-The FFS Project
Yadav, D.
1/07/19 → 30/06/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Large scale model test of construction influenced by tunneling and its protection measures
1/08/19 → 31/08/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Lattice Boltzmann Method for Micro- and Nanoscale Fluid Flows and Heat Transfer
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Lattice Boltzmann Study on Noncontinuum Flow and Mass Transfer of Shale gas in complex porous media
1/09/22 → 31/08/25
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Life Cycle modeling and Design Knowledge Development in Virtual Environments.
Reffat, R. & Gero, J. S.
1/01/02 → 31/12/04
Project: Other Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Logistic scheduling
Bai, R., Bargiela, A. & Anberree, T.
1/02/08 → 28/02/10
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Logistics Service Network Optimisation and Multi-mode Intelligent Container Operations Scheduling
1/06/15 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Low Carbon Automobile Thermal Management Frontier Technology Innovation Team
1/12/15 → 30/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Low -cost Indoor Mobile Mapping for BIM Application
Hancock, C.
8/05/17 → 31/08/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Marine Composites Development and Manufacturing for Sustainable Environment
1/10/15 → 30/09/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Measurement Uncertainties on Efficiency Test of High-Efficiency Induction Machine
1/10/16 → 30/09/17
Project: Contract Projects › Horizontal-International Contract Projects
-
Mechanism of coupling between fluid dynamics and chemical reaction in the process of synthesising of micro fine powder materials using combined reactors and the process control
1/01/16 → 31/12/19
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Mechanism of housing expropriation in Ningbo under the background of urban organic renewal
15/11/19 → 30/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Mechanism on microwave-coupled structured catalysts synergistically enhance the gas-solid catalytic reaction
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Med-FAUNet Model for Ultrasound Image Segmentation
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Media and Fakery Symposium
8/10/19 → 31/07/20
Project: University Funded Projects › Internal-RKE Conference and Event Organising Support Project
-
Mobile phone acquisition data crawling and data structure system
1/06/19 → 31/10/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Model and Data Driven Hyper-Heuristics for Combinatorial Optimization and Their Applications in Port Operation Integrated Scheduling
1/01/21 → 31/12/24
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Modeling the paleo Haizishan ice cap in the southeastern Tibetan Plateau
National Natural Science Foundation of China (NSFC)
1/01/16 → 31/12/18
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Multidisciplinary guideline project for personalized treatment of biological agents
1/08/23 → 30/11/24
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Multi-fuel, high reliable solid oxide fuel cell stack technology
Konysheva, E.
1/07/19 → 1/07/22
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Multi - objective optimization theory and method for waste recycling of electronic products
Gu, F.
Ningbo Science and Technology Bureau
1/10/16 → 30/09/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects