Search concepts
|
Selected filters
|
- 150 - 200 out of 578 results
Search results
-
How can UNNC further contribute to the internalization process of Ningbo city
2/01/17 → 30/09/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Effect of char formation on its dielectric property at high temperature in microwave pyrolysis of biomass and study on microwave enhanced mechanism of char surface reaction
Natural Science Foundation of Ningbo
6/01/17 → 1/01/23
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Europe’s Lost Frontiers: exploring climate change, settlement and colonisation of the submerged landscapes of the North Sea basin using ancient DNA, seismic mapping and complex systems modelling
Ch'ng, E.
12/01/17 → 30/11/21
Project: Government Funded Projects › Vertical-International Government Funded Projects
-
Environmental Assessment Standard for Advanced Sustainability of Ningbo City Planning and Management
Cheshmehzangi, A.
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
The enntrepreneurship eco-system of "SME-Unviersities-Established Firms"--the perspective of Mindset and behaviors
Chen, X.
1/02/17 → 31/01/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Policy and Mechanism Study for Activating and Utilizing the Abandoned Rural House on Taogong Island, Dongqian Lake
Cheshmehzangi, A.
27/02/17 → 26/02/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Pilot Reform Project-High level Sino-Foreign University Building
1/03/17 → 30/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Working plan of establishing Ningbo demonstration area to integrate culture and finance
1/03/17 → 31/08/17
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The Study of Strengthening Ningbo Stock Exchange to Serve Enterprises
1/03/17 → 31/08/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Novel reactor industrialization development of precursor of lithium battery anode material
1/04/17 → 31/12/18
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Thirteen Five Tourism Plan for Haishu District, Ningbo
24/04/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Low -cost Indoor Mobile Mapping for BIM Application
Hancock, C.
8/05/17 → 31/08/17
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Research on the current situation of corporate leverage and the path of deleveraging
1/06/17 → 31/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Promoting Ningbo city internationalization progress: the role played by the government
1/06/17 → 30/03/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on Financial Inclusion Index based on China Financial Inclusion Index System (2016)
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Financial Consumer Rights Protection Assessment
1/06/17 → 30/05/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Development and engineering demonstration of novel efficient dust removal technologies in coal-fired power plant
1/07/17 → 30/06/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The price impact of order book events and stock volatility on the Chinese market
1/07/17 → 30/06/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
How children develop their abilities to automatically process Chinese characters: a behavioral and Event-Related Potential study
Jin, L.
1/07/17 → 26/07/22
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Development and project demonstration of large-scale coal water slurry gasification
1/07/17 → 30/04/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Precursors synthesis process and stintering process optimization
1/08/17 → 30/09/20
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
Advanced Laser Project
1/09/17 → 31/08/21
Project: Contract Projects › Horizontal-Contract Projects out of Zhejiang Province
-
How to attract more FDI to Ningbo under the One belt one road national strategy ()
1/09/17 → 31/12/17
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Fault diagnosis for electrical machine systems in the electrification transportation applications
1/09/17 → 31/12/20
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Unified Information System Based Supply Chain Integration and Optimisation for Intermodal Transportation: A Study on Ningbo Port
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Cultural heritage and cross-border communication studies along the land/maritime silk road in the digital age: Construction of an open and VR-available cloud-based heritage database with social function
Ch'ng, E.
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Robust Data Mining Technologies and Their Applications in Cold Chain Logistics Big Data Analytics
1/10/17 → 30/09/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Speed Up the Establishment of Ningbo International Chamber of Commerce New Business Models Referring to British Chamber of Commerce Business Model
1/10/17 → 31/07/20
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research on Key Technology of Bridge Deformation Monitoring Based on Multi-Frequency BDS / GPS
Hancock, C.
1/10/17 → 30/09/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Two-way flow of capital and 2025 China manufacturing
Zhang, Y.
1/11/17 → 15/12/19
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Approaches to improve urban eco-environment quality in Ningbo
1/12/17 → 31/12/19
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Practices and Strategies of Cultural Industry in Ningbo towards the Matching of Capital Market
1/12/17 → 31/08/21
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Coating on metal for marine anticorrosion application
1/12/17 → 30/11/20
Project: Contract Projects › Horizontal-Zhejiang Provincial Contract Projects
-
Ningbo’s internationalization strategy and its role in the Belt Road Initiative
Tan, P. M.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the current situation of International quality Educational Resources in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Study on how to extend the healthcare international collaboration through the University of Nottingham Ningbo China
Hsieh, C.
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A Study on the Prospect of " 16+1 " Trade and Economic Cooperation Demonstration Zone in Ningbo
12/12/17 → 30/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on the Countermeasures of building the international talent community in Ningbo
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Research on further optimization of enterprise financing environment in Ningbo
Zhou, J.
14/12/17 → 31/05/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
A study on the deepening of the reform of the commercial registration system in Ningbo
Ge, J.
14/12/17 → 13/11/18
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
light-weight and high-strength SMC Composites Materials
31/12/17 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Improve the Ductility of NdFeB materials
1/01/18 → 31/12/19
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
Research and Demonstration Project of Equipment for Domestic Waste Pyrolysis and Gasification-Research and Development of Nitrogen Control Technology of Pyrolysis, Gasification and Combustion of Municipal Solid Waste
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Ningbo Municipal Government Funded Projects
-
Investigation on the high temperature creep behaviour of thermal barrier coating systems
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
The Relationship of Uncertainty and Business Cycles in China
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
Ningbo InsuranceTechnology Industry Development Report
1/01/18 → 31/12/18
Project: Contract Projects › Horizontal-Ningbo Municipal Contract Projects
-
The Chinese Economists Society President's Forum: New Challenges for Public Policy and Management
1/01/18 → 30/12/18
Project: Government Funded Projects › Vertical-Zhejiang Provincial Government Funded Projects
-
High Humanistic Paradigm in Human Resource Management: Construct, Outcomes and Mecnisms
1/01/18 → 31/12/21
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
The design and controllable synthesis of coal-fired flue gas Hg0 and SOx transfer catalyst and its mechanism study
Zhao, H., Xu, M. & Yang, G.
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects
-
Seismic Performance of Reinforced Concrete Beam-Column Joints with Headed Diagonal Reinforcements
1/01/18 → 31/12/20
Project: Government Funded Projects › Vertical-National Government Funded Projects